Tender Announcement
Hess (Indonesia-Pangkah)

INVITATION FOR PRE-QUALIFICATION
UJUNG PANGKAH OFFSHORE PHASE II
 
CPP/AUP PLATFORM INSTALLATION AND
INFIELD FLOWLINE HOOKUP & COMMISSIONING CONTRACT
(REF. NO.: BID-07-0366B)
 
Hess (Indonesia-Pangkah) (HIPL) Ltd, as the Operator for the Ujung Pangkah Offshore PSC located offshore East Java, herein invites Service Providers to participate in our pre-qualification process for the provision of Platforms Installation, Dog-Leg Spool Installation, and Infield Flowline Hookup & Commissioning Contract for the following Phase II offshore works at the Ujung Pangkah site.
 
DESCRIPTION OF WORK
 
1) Installation of the following offshore facilities:
a) Compression & Processing Platform (CPP) - a 4 leg structure (topsides deck weight greater than 2000 MT in water depth, 10 m);
b) Accommodation and Utilities Platform (AUP) - a 4 leg structure with accommodation suitable for 35 persons (topsides deck weight approx. 2000 MT in water depth, 10 m);
c) 6” OD dog leg spool for infield flowline at CPP. Balance of line pipe to be installed under a separate contract. Pipe for dog leg spool shall be purchased by HIPL and free-issued to Contractor.
 
2) Hookup & Commissioning of infield flowline (6” OD x 5.6 km long).
The Successful Contractor shall be responsible for providing necessary transportation spreads, platform installation spreads, dog leg spool installation spreads, hook-up spreads and associated accessories for transportation and installation of the CPP & AUP facilities and dog leg spool. The Successful Contractor shall also be responsible for project management, engineering, procurement of consumable and temporary materials necessary for the platform installation and dog leg spool installation, hookup and commissioning work. The Successful Contractor shall coordinate/interface closely with the EPCC Contractors for the CPP & AUP platforms and the Infield Flowlines Installation providing all the necessary design, analyses, drafting, and documentation deliverables in accordance with best engineering practice, to complete the work.
 
PREREQUISITE FOR REGISTRATION
 
Only Service Providers with the following qualification can participate in this prequalification process.
 
a) Possess Valid Sertifikat Badan Usaha (SBU) issued by GAPENRI registered in LPJK.
b) Possess Valid NPWP (Taxpayer Identification Number) certificate.
c) Possess Valid SIUP Certificate or Valid IUT Certificate.
d) Possess Valid IUJK Certificate (not required for those who have IUT Certificate).
e) Possess Article of Association and its related amendments.
f) Possess Valid KADIN certificate.
g) Possess Valid Surat Keterangan Terdaftar (SKT) MIGAS.
h) Possess Valid ISO 9001 accredited Quality Management System certificate.
i) Possess proof of tax payment: Latest year of Setoran Pajak Tahunan (SPT/PPh) and monthly report of PPh Article 25 or Article 21/Article 23 or PPN, at least for the last 3 (three) months.
j) Possess a proven, demonstrated track record in the design, procurement, installation, hookup and commissioning of offshore subsea pipeline systems as the main Contractor in the past ten (10) years.
k) Have a proven, demonstrated track record and capability of completing transportation of and installation of similar offshore platforms as the main Contractor In the past ten (10) years.
l) Possess sufficient manpower, resources and capacity to complete the required services within the nominated schedule.
 
Should your company meet the above qualification, you may register your company by tendering a letter which expressing your interest to participate in this prequalification process at the schedule given below. Please also include your detail address, phone and fax number as well as contact person in your letter.
 
SCHEDULE OF REGISTRATION
Date: 9 -12 September 2008
Place: Hess (Indonesia-Pangkah) Limited, Sentral Senayan I, 5th Floor,
JI. Asia Afrika No.8, Jakarta 10270,
Attn.: M Niza Krissektianto
 
Jakarta, 8 September 2008
Hess (Indonesia-Pangkah) Limited
Bid Committee