Tender Announcement
Pertamina Hulu Energi ONWJ Ltd.

bpmigas                                                                                       PERTAMINA
                                                                                                                                    PHE - ONWJ

BID ANNOUNCEMENT
No. STC-0558 & STC-0559

Pertamina Hulu Energi ONWJ Ltd. (“PHE ONWJ”) as the Operator of the Offshore Northwest Java Production Sharing Contract, hereby invites potential services contractors to participate in a Pre-Qualification process for Bids No. STC-0558 “EPCI Contract for 3 new NUI Platforms and pipeline of APN E/F New Field Development Project” and STC-0559 “EPCI Contract for MM Compressor Reconfiguration of APN E/F New Field Development Project”. These bids shall be conducted in compliance with BPMIGAS Pedoman Tata Kerja No. 007-Revisi-1/PTK/IX/2009, the work procedure guidelines on supply chain management for Cooperation Contract Contractors.

GENERAL SCOPE OF WORK for STC-0558
The awarded Contractor shall require to perform Engineering, Procurement, Construction/Fabrication, Installation, Hookup, Pre-commissioning, Commissioning and Start-up assistance for APN-E/F New Field Development Project comprising main scope of:
• Install 3 NUIs (Normally Un-attended Installation) / braced caisson monopod wellhead platforms : APNE-A, APNE-B and APNF
• Install 24” pipeline from APNF and APNE-A to the existing 24” trunk-line to MM Complex
• Install 10” spur lines from APNE-B to the main APNE-A to 24” trunk-line to MM
• Install Sub sea tie-in at two locations (from APNF & APNE-A)

GENERAL SCOPE OF WORK for STC-0559
The awarded Contractor shall perform Engineering, Procurement, Construction/Fabrication, Installation, Hookup, Precommissioning, Commissioning and Start up assistance for APN E/F New Development Project comprise of main scope of:
• Reconfiguration of MMC Gas Compression System
- Modification of the associated Air Intake and Exhaust Collector
- Upgrade of its Control System upgrading (TT2 – TT4)
• Modification of the associated instrumentation and electrical system, piping system, Fire and Gas System, Fuel Gas System, Fin Fan Cooler and Lube Oil Cooler at MMC
• Modification of Feed Gas System, Shutdown System at MMC
• Reinforce MMC platform structure
• Additional SDV installation at MMC
• Modification of telecommunication system to connect APN-E/F NUI and PCP

The awarded Contractor must have extensive experience in providing similar services with extreme conditions like West Java sea in Indonesia as well as ensuring safe and efficient project execution, anticipating severe site weather conditions, and must also ensure safety considerations from multiple worksites. Vessel and Marine system availability is important, consideration will be given to early availability of Vessel and Marine system to commence the Work in the period between July 2011 – December 2011. Vessel and Marine system availability later than that period will not be acceptable to Company and may be basis for disqualification by Company.

For the pre-qualification process, all bidders must comply with following general requirements:
• Have good financial statement audited by external auditor which can be proven and verified by PHE ONWJ
• Established an office in Jakarta
• Established a Marine logistics operational base & jetty to support offshore execution
• Established a Fabrication Yard & storage facility / warehouse preferably in Indonesia
• Have extensive experienced in providing similar services in areas similar to offshore sites like West Java area in Indonesia
• Interested Foreign Contractors must establish a joint co-operation with an Indonesian Company (with the classification below). The Foreign Contractors must have extensive experience in providing similar services in areas similar to offshore sites like West Java
area in Indonesia
• Must have excellent HSE Management System and track record of safety performance which can be proven and verified by PHE ONWJ

No.
Subject
Bid No.
Qualification
Classification
Minimum Local Content Requirement
1.
 
EPCI Contract for 3 new NUI Platforms and pipeline of APN E/F New Field Development Project
 
STC-0558
 
Usaha Besar
 
B. PROJECT
B.01.04 Offshore Production Platform and Facilities
B.01.05 Pipeline and Support
B.02.04 Mechanical Services
B.02.08 Offshore Production Facilities
35%
 
2.
 
EPCI Contract for MM Compressor Reconfiguration of APN E/F New Field Development Project
 
STC-0559
 
Usaha Besar
 
B. PROJECT
B.01.04 Offshore Production Platform and Facilities
B.02.04 Mechanical Services
B.02.08 Offshore Production Facilities
35%
 


To participate in this Pre-Qualification process for the above tender, all Bidders shall register to the Company by submitting the following requirements:
1. Expression of interest letter
2. Valid PHE ONWJ Surat Keterangan Terdaftar (”SKT”)
3. Commitment letter to achieve minimum Local Content requirement as requested in the above table

For those Bidder who do not have a valid PHE ONWJ SKT, shall submit the following requirements:
1. Share holder chart
2. Organization chart
3. Business License (SIUP/SIUPAL/IUT)

The above documents must be submitted to:
                              PHE ONWJ Procurement Committee
                              Perkantoran Hijau Arkadia, Tower F, 10th Floor
                              Jl. TB Simatupang Kav. 88
                              Jakarta 12520, Indonesia

Registration period : 3 June to 7 June 2010, 07.30 am – 11.30 am
Late registration/submission will not be accepted by the Company

Jakarta, 3 June 2010
PHE ONWJ Procurement Committee

[print version]

2000-2012pPetromindo.Com. Web Design by Petromindo.Com. All Rights Reserved. See Disclaimer for details.