Tender Announcement
PT PLN (Persero)

PT PLN (PERSERO)
 
 
PT. PLN (PERSERO)
INVITATION TO PREQUALIFICATION
ASAHAN NO. 3 HYDROELECTRIC POWER PLANT
CONSTRUCTION PROJECT
LOT II: METAL WORKS
JICA LOAN NO. IP-532
 
1. The Government of (GoI) through its executing agency “PT. PLN (Persero)” has received a loan under the Official Development Assistance (ODA) from Japan International Cooperation Agency (JICA) toward the cost of captioned project.
 
2. PT PLN (Persero) intends to pre-qualify International contractor(s) specializing in the Lot II Metal Works of this Asahan No. 3 Hydroelectric Power Plant Construction Project (with the installed capacity of 2 x 87 MW), which shall comprise the Intake Weir Facilities, Power Intake Facilities, Headpond Facilities, Steel Penstock Facilities, Draft Tube Gates Facilities, Tailrace Outfall Closure Facilities, and Electric Power Receiving and Supply Facilities, including Operation and Control System, under the following Contract Package:
 
Asahan No. 3 Hydroelectric Power Plant Construction Project
Lot II: Metal Works
North Sumatera (Sumatera Utara) Province, Indonesia
 
3. Pre-qualification is open to firms voluntarily formed joint ventures / consortium from eligible countries who shall have successful previous experience for the Hydromechanical Equipment / Metal works in at least two (2) Power Generation Projects (PGPs) including at least one (1) hydroelectric power construction project; the PGPs of which had completed in 1980 or later and had the following features:
 
(a) The said 2-PGPs had the installed capacity of more than 25MW, in the outside of the Applicants registered home country or Indonesia.
(b) Among the said 2-PGPs, at least 1-PGP:
- Was executed under the contract using FIDIC s Conditions of Contract and finance by JICA, World Bank or Asian Development Bank (ADB) or international aid organization.
- Had the fixed-wheel type steel gate, having gate area more than 30.0 m2 upon multiplying clear gate span (m) by clear gate height (m).
- Had the exposed or embedded type welded steel penstock with bifurcation, having inside diameter more than 3.0 m and design head more than 200.0 m, both at the inlet of bifurcation.
- Had the hydraulic-drive butterfly type isolating valve in inside diameter more than 1.6 m.
 
4. Further detail information are given in instruction to Applicants within PG document.
 
5. The prequlification documents are available for a non-refundable fee of Indonesian Rupiah Five Million (Rp. 5,000,000) or USS 500 in cash or bank draft. Eligible Applicants may obtain the prequalification document from November 09, 2010, within office hours, from the address below:
 
PT. PLN (PERSERO) KANTOR PUSAT
DIRECTOR OF STRATEGIC PROCUREMENT
C/O HEAD OF STRATEGIC PROCUREMENT DIVISION
Main Building. 15th Fl.
Jl. Trunojoyo Blok M I/135
Kebayoran Baru
Jakarta 12160, Indonesia
Telephone: +62-21-7251234
Fax: +62-21-7227060
 
6. Submission of Applications for Pre-qualification, in one (1) original and two (2) copies, must be received in sealed envelopes or packages, either delivered by hand or by registered mail to the address above not later than December 24, 2010, within office hour, and be clearly marked “Application to Pre-Qualification for Asahan No. 3 Hydroelectric Power Plant Construction Project Lot II: Metal Works, JICA Loan No. IP-532”.
 
7. Applicants will be advised, in due course, of the results of evaluation on their applications. Only prequalified Applicants will be invited to bid. It is expected that the Invitation to Bid will be made in February 2011.
 
                                                                            Jakarta, November 08, 2010