Adaro Energy update: Maritim Barito Perkasa
Tuesday, November 1 2016 - 03:36 AM WIB
The following is an edited excerpt from IDX-listed energy firm PT. Adaro Energy's quarterly report released on Monday. (ed)
PT Maritim Barito Perkasa (MBP)
In 3Q16, MBP?s total coal barging volume was 10.56 Mt and total coal loading volume was 8.66 Mt. Total coal barging volume for 9M16 was 27.32 Mt, 12% higher than 9M15 and total coal loading volume for 9M16 was 24.91 Mt, 11% lower compared to 9M15. MBP continues to prioritize volume from the Adaro Energy group, and Adaro?s coal volume accounted for 96% of MBP?s total coal barging and all of MBP?s coal loading volume in 9M16. (end of edited excerpt)
| Unit | 3Q16 | 2Q16 | 3Q16 vs 2Q16 | 3Q15 | 3Q16 vs 3Q15 | 9M16 | 9M15 | 9M16 vs 9M15 | |
| Total coal barging | Mt | 10.56 | 9.29 | 14% | 9.07 | 16% | 27.32 | 24.29 | 12% |
| Total coal loading | Mt | 8.66 | 8.43 | 3% | 10.02 | -14% | 24.91 | 27.96 | -1 |
