The following is an edited excerpt from IDX-listed energy firm PT. Adaro Energy's quarterly report released on Monday. (ed)
PT Saptaindra Sejati (SIS)
During the quarter, SIS booked total coal production volume of 9.52 Mt and overburden removal volume of 46.40 Mbcm. Total coal production in 9M16 was 25.67 Mt, 13% higher compared to 9M15, while total overburden removal for 9M16 was 119.52 Mbcm, 2% lower compared to 9M15.
SIS continued to focus on serving Adaro Energy Group. Overburden removal and coal production volume from Adaro were 62% and 75% of SIS?s total volume in the quarter, respectively. (end of edited excerpt)
| Unit | 3Q16 | 2Q16 | 3Q16 vs 2Q16 | 3Q15 | 3Q16 vs 3Q15 | 9M16 | 9M15 | 9M16 vs 9M15 | |
| Overburden Removal | Mbcm | 46.40 | 41.01 | 13% | 44.02 | 5% | 119.52 | 122.05 | -2% |
| Coal Production | Mt | 9.52 | 9.04 | 5% | 8.12 | 17% | 25.67 | 22.79 | 13% |