The following is an edited excerpt from IDX-listed energy firm PT. Adaro Energy's quarterly report released on Tuesday. (ed)

PT Saptaindra Sejati (SIS)
During the quarter, SIS booked a total coal production volume of 9.66 Mt and an overburden removal volume of 43.57 Mbcm, 45% and 50% higher y-o-y, respectively. SIS?s total coal production in 2016 was 35.33 Mt, 20% higher compared to 2015, while total overburden removal for 2016 reached 163.09 Mbcm, an 8% increase over 2015.

Overburden removal and coal production volume from AE were 59% and 74% of SIS?s total volume in 2016, respectively. While SIS continues to prioritize AE, we expect that going forward SIS will add more third-party volume. (end of edited excerpt)

Unit 4Q16 3Q16 4Q16 vs 3Q16 4Q15 4Q16 vs 4Q15 FY16 FY15 FY16 vs FY15
Overburden Removal Mbcm 43.57 46.40 -6% 29.02 50% 163.09 151.07 8%
Coal Production Mt 9.66 9.52 1% 6.68 45% 35.33 29.47 20%