AED reports exploration progress at S. Madura block

Monday, August 16 2010 - 04:30 AM WIB

The following is an excerpt from Australian firm AED Oil Ltd's report filed with the Australian Stock Exchange on exploration progress at S. Madura block.

Gigir East-1 Exploration Well, South Madura PSC
The drilling of the Gigir-1 well is progressing according to the drilling plan. the 121/4" section has been drilled to a depth of 619 MDRT and 9 5/8" casing has been set. Drilling of the 8 1/2" section is underway with an estimated Total Depth of about 1,300m

Further updates will be made on a regular basis unless additional disclosure is required.

The South Madura Joint Venture consists of Cooper Energy (30% and Operator), AED (60%) and PT Eksindo South Madura (10%). (end of excerpt)

Share this story

Tags:

Related News & Products