The following is the update report regarding to operational activities of PT Apexindo Pratama Duta Tbk as of March 31, 2014.
| Onshore Rig | |
| Rig 2 | This 1000HP rig is currently stacked in Apexindo's Bojonegara Yard and is being actively marketed at the moment
Activity: general cleaning and maintenance |
| Rig 4 | This 1500 HP rig is currently stacked in Bojonegara Yard and is being actively marketed at the moment
Activity: general maintenance |
| Rig 5 | Working for Virginia Indonesia Co., LLC in Samberah, East Kalimantan.
Activity: drilling. |
| Rig 8 | This 1000 HP rig is currently stacked in Luwuk, Central Sulawesi |
| Rig 9 | Working for Virginia lndonesia Co., LLC in Samberah, East Kalimantan
Activity: drilling |
| Rig 10 | This 2000HP rig is currently stacked in Muara Laboh and is being actively marketed at the moment
Activity: general maintenance |
| Rig 14 | Working for PT Ogan lnterior Gas & PT East Ogan Methane, South Sumatera
Activity: currently drilling the second of three wells program of CBM project in Prabumulih |
| ? | ? |
| Offshore Riq | |
| Maera 101 | Working for Total E&P Indonesie in Tunu, East Kalimantan
Activity: drilling. |
| Raisis 102 | Working for Total E&P Indonesie in Tunu, East Kalimantan.
Activity: drilling. |
| Raissa 103 | Working for Total E&P Indonesie at Tunu, East Kalimantan
Activity: Force majeure due to shallow gas well control issue |
| Yani 104 | Working for Total E&P Indonesie at Tunu, East Kalimantan
Activity: drilling. |
| Raniworo 201 | Working for Total E&P lndonesie at Peciko Area, East Kalimantan
Activity: drilling |
| Soehanah 202 | Working for Total E&P lndonesie at Sisi Nubi, East Kalimantan.
Activity: drilling. |