The following is an update of the operational activities of PT Apexindo Pratama Duta Tbk as of April 30, 2008.

Onshore Rig

Rig 2: Working for PT Medco E&P Indonesia. Activity: mobilization of rig from South Sembakung, East Kalimantan to designated drilling location at Nuansa, South Sumatra.

Rig 4: Working for Chevron Geothermal Salak Ltd. at Gunung Salak, West Java. Activity: drilling.

Rig 5: Working for VICO Indonesia at Nilam, East Kalimantan. Activity: drilling

Rig 8: Preparation for demobilization of rig from EMP Kengean to other location to be determined later.

Rig 9: Working for VICO Indonesia at Nilam, East Kalimantan. Activity: drilling.

Rig 10: Working for WCO Indonesia at Nilam, East Kalimantan. Activity: drilling.

Rig 14: Working for VICO Indonesia at Nilam, East Kalimantan. Activity: preparing to spud-in new well

Rig 15: Activity: stack in Jambi

Offshore Rig

Maera 101: Working for Total E&P Indonesie at Handil, East Kalimantan. Activity: drilling.

Raisis 102: Working for Total E&P Indonesie at Handil, East Kalimantan . Activity: drilling.

Raissa 103: Working for Total E&P Indonesie at Tunu Field, East Kalimantan. Activity: drilling.

Yani 104: Activity: Dry docking.

Rani Woro 201:Working for Santos (Sampang) Pty. Ltd. Activity: rig move.

Soehanah 202: Working for Total E&P Indonesie at Sisi and Nubi field, East Kalimantan. Activity: drilling. (end)