Bhumi Jati unveils PQ tender for coal supply

Tuesday, April 12 2016 - 01:06 AM WIB

PREQUALIFICATION ANNOUNCEMENT FOR THE COAL PROCUREMENT
FOR THE TANJUNG JATI B EXPANSION (JAWA-4) COAL FIRED STEAM
POWER PLANT (2x1,000 MW)

PT. Bhumi Jati Power, invites companies and consortium of companies holding valid IUP-OP (Mining Business License -Production Operation / ljin Usaha Pertambangan Operasi Produksi) or valid CCoWs (Coal Mining Business Contracts of Work) to participate in the prequalification for the Coal Procurement for Tanjung Jati B Expansion (Jawa-4) Coal Fired Steam Power Plant (2x1,000 MW), with the coal specification as per the table below. Companies holding valid IUP-OPK (Special Operation Production Mining Business License / Ijin Usaha Pertambangan Operasi Produksi Khusus) for processing and/or refining may only participate by forming consortium with other IUP-OP or CCoW holder. Indicative quantities being sought are approximately 7 million metric tonnes of coal per annum in total, expected to commence in 2019:

Description Units Lot H Lot L
Gross Calorific Value (ar) Kcal/kg 4,500-5,500 4,000-4,999
Grindability (hardgrove Indeks) Indeks >38 >38
Total Moisture (ar) % <32 <36
Total Sulphur Content (ad) % <0.64 <0.58
Ash Content (ad) % <9.4 <8.5
Ash Fusion Temperature (initial Deformation) ?C >1,130 >1,130
Operation Status   Current Operating Mine Current Operating Mine
Annual Production in 2015   >2.5 million tonnes >2.5 million tonnes

Registration and retrieval of the complete Prequalification Document

Date/ Time By 17:00 WIST 19th of April 2016
Place By electric mail (e-mail) to tjb56coal@sc-tjb.com

The Prequalification Document shall be submitted to the following address at the latest:
Date. : 21st of April 2016
Time : 17:00 WIST (Western Indonesia Standard Time)

PT. Bhumi Jati Power
Summitmas I, 15th Floor, JI. Jend. Sudirman Kav. 61-62,
Jakarta 12190?Indonesia.
Attn: President Director of PT. Bhumi Jati Power

Complete requirement for Prequalification wilt be provided in the Prequalification Document.

Jakarta, 12th of April 2016
PT. Bhumi Jati Power
Share this story

Tags:

Related News & Products