LSE-listed Bumi Plc reported on Wednesday that the company was in track to reach 2013 production target of 23 million tons.

It reported a continued strong operational performance at PT Berau with April 2013 production at 2.0mt, taking year to date (YTD) production to 7.3mt, an increase of 27% against production of the prior year period.

The stripping ratio down 21% against year to date 2012, while the production cost of sales down 9% against year to date 2012.

Average selling price was $62.9/t in April 2013, with YTD April 2013 ASP of $63.1/t 19% lower than the same period last year.

Berau Coal Unaudited YTD April 2013 Q1 2013 YTD April 2012 Q1 2012 YTD APR 13 v YTD APR 12
Coal mined (mt) 7.3 5.3 5.8 4.1 27%
Sales (mt) 7.5 5.5 6.1 4.6 21%
FOB average selling price ($/t) ?63.1 63.2 77.8 78.3 (19%)
Production cost of sales ($/t) 36.4 36.6 39.9 39.2? 9%
Stripping ratio (bcm/t)? 8.5 8.4 10.8 10.6 (21%)
1. Bank cubic metres (bcm) of overburden removed per tonne of coal mined

2. Restated

Editing by Adianto P. Simamora