Coal stock at Suralaya plant remains sufficient: Indonesia Power
Tuesday, January 15 2013 - 02:32 AM WIB
By Godang Sitompul
Despite the bad weather condition which has caused high sea waves, the level of coal stock at PT Indonesia Power?s Suralaya power plant in West Java remains at sufficient level.
?The coal stock is at safe level, sufficient for more than 20 days,? President Director of Indonesia Power, Djoko Hastowo told Petromindo.com Tuesday.
He acknowledged, however, that the high sea waves had hampered coal loading and unloading activities at the port, reducing the number of vessels entering the Suralaya complex.
Editing by Reiner Simanjuntak
