COAL TENDER: Udupi Power holds tender for 0.5mt coal supply
Friday, August 16 2013 - 03:41 AM WIB
INTERNATIONAL COMPETITIVE BIDDING FOR SUPPLY OF IMPORTED COAL FOR 1200 MW (2 X 600 MW) UDUPI POWER PLANT
UDUPI DISTRICT, KARNATAKA STATE, INDIA.
TENDER NO. UPCL/ICB/01/2013-14
1. Udupi Power Corporation Limited (UPCL) has set up an imported coal based 1200 MW (2 x 600 MW) Udupi Power Plant (UPP) in Yelluru, Udupi District of Karnataka State, India. The commercial operation date of the Unit #1(600 MW) is achieved on 11.11.2010 and that for Unit #2 on 19.08.2012.
2. UPCL invites Bids for ?Supply of 0,5 Million Tonnes of Coal? for the Power Station on CIF basis from Suppliers meeting the following requirements:
2.1 Coal Quality: Bituminous/ Steam Coal to be supplied shall have Gross Calorific Value range (as received basis) of 5900 - 6200 Kcal/Kg with sulphur content not to exceed 0.8 % (air dried basis), ash content not to exceed 12 % (air dried basis) and moisture content not to exceed 12 %(as received basis)
2.2 Financial Capacity: Bidder shall have minimum Net worth of Rs. 500 crores (Rs.Five Hundred crores only) or equivalent at the close of the preceding financial year i.e. 2012-13 and minimum Turnover of Rs.1000 crores (Rs.One Thousand Crore Only) or equivalent at the close of immediate preceding 3 financial years i.e.2010-11, 2011-12 & 2012-13
2.3 Technical Capacity: The Coal Supplier shall be an ?Established Coal Producer? with an annual production capacity during the immediate preceding 3 financial years viz., 2010-11, 201 1-12 & 2012-13 of 1 (one) million tonne or more and having reserves of more than 15 (fifteen) million tonnes of coal.
A ?Regular Supplier? of bulk quantity of coal having supplied annually more than 0.5 (one by half) million tonnes or more during the immediate preceding 3 financial years viz., 2010-11, 2011-12 & 2012-13 and having back to back arrangement with equity investment with an ?Established Coal Producer? who meets the Qualifying Requirement as specified in the bid document. Regular Supplier and Established Coal Producer shall be jointly and severally responsible for the successful performance of the contract
Note: The Bidders should have in the past supplied directly or through PSU?s to any Power/Cement/Steel/Fertilizers/Industrial utilities, at least under 2 (two) Long Term Supply Contracts (CIF Basis), quantity of 0.5 (one by half) million tonne or more per annum under each of the contract for the immediate preceding 3 financial years viz., 2010-11, 2011-12 & 2012-13.
2.4 The Coal Supplier or Regular Supplier who intends to get qualified for supply of Coal shall have firm long term transportation arrangement with Ship-Owners meeting the qualifying requirements for transportation arrangement as stipulated in the bid document.
3. Complete set of bid documents may be purchased by any interested bidder or his authorized representative upon payment of non-refundable ?amount of Rs. 1,20,000 (Rupees One Lakh Twenty Thousand only) I US $ 2000 (US Dollars Two Thousand only) towards the cost of bid documents by way of Demand Draft / remittance by wire etc. in favour of Udupi Power Corporation Limited, payable at Bengaluru. The bid documents shall be available from 15.07.2013 to 22.08.2013 at the following address:
The Director ? Technical
Udupi Power Corporation Limited
Le-Parc Richmonde, 2nd Floor,
No. 51, Richmond Road,
Bengaluru - 560 025,
Karnataka, INDIA.
Phone: 0091-80 - 4025 4025, Fax: 0091-80 -4025 4000
E-mail: mulla.ra@lancogroup.com; murali.ds@lancogroup.com