Cooper Energy reports Indonesian drilling update

Saturday, August 18 2007 - 12:43 AM WIB

The following is an excerpt from Cooper Energy drilling update report released on Friday.

 

Kurnia-1 (South Madura PSC, , COE 30% Capped Free Carry)

 

Since the last release wireline logs have been acquired over the interval 631 to 1,231 metres. The current operation is widening the original pilot hole to 21” prior to running the 16” casing string. (end of excerpt)

Share this story

Tags:

Related News & Products