Cooper Energy updates Kurnia-1 drilling activity
Tuesday, September 18 2007 - 02:43 AM WIB
The following is an excerpt from Cooper Energy drilling update report released on Tuesday.
Kurnia-1 (South Madura PSC,
The rig has drilled the 12 ¼” pilot hole to from 2,141 to 2,420 metres. Once the pilot hole total depth is reached (2,500 metres) wireline logs will be run over 2,141-2,500 metres. Following logging, the pilot hole will be widened to 17” in preparation for running the 13 ⅜” casing. (end of excerpt)
