GE Oil & Gas to supply equipment for TotalFinaElf E&P Indonesie gas processing plant

Tuesday, October 29 2002 - 11:55 PM WIB

GE Oil & Gas, a business unit of Atlanta-based GE Power System announced Tuesday it had received a contract of US$29 million to supply two gas turbine-powered compressor trains for the Peciko 4 gas processing plant in Balikpapan, East Kalimantan operated by TotalFinaElf E&P Indonesie.

The scope of GE's contract includes two PG25+ gas turbines, each with a rated output of 29 megawatts; and two centrifugal compressors. The two compressor trains will undergo testing at GE's facility in Florence, Italy before they are shipped to the project site.

GE also will supply inlet and exhaust systems on a single-lift arrangement for easy on-site installation, control and protection panels, installation and commissioning supervision, and spare parts. PT. Pal of Indonesia, GE's consortium partner for the project, will handle logistics and part of the scope of supply to be sourced locally.

The GE equipment will be shipped to the site in January of 2004 with the plant expected to begin service in June of 2004.

GE Oil & Gas previously has supplied equipment for two other gas processing plants (Tunu 7 and Tunu 8) in the vicinity of the Peciko site. (alex)

Share this story

Tags:

Related News & Products