Halliburton bags drilling waste management from Total

Friday, January 27 2006 - 01:44 AM WIB

US service company Halliburton said that its Baroid Surface Solutions(TM), part of the company's Fluid Systems segment, has been awarded a drilling waste management contract by TOTAL E&P INDONESIE for the Mahakam Delta in EastKalimantan.

This four-year contract is the largest of its kind in the

Asia Pacific region. Scheduled to begin in the second quarter of 2006, the contract will include treatment of drill cuttings and recovery of oil for re-use in drilling fluids.

Halliburton will be providing rig site waste management supervisors and collection equipment, along with a purpose-built Ground Control(TM) site. This Ground Control facility will use thermal desorption units to handle and treat the waste streams generated by drilling operations, returning the maximum possible recovered fluids to the operator.(alex)

Share this story

Tags:

Related News & Products