ASX-listed Indo Mines Limited announced Wednesday the completion of a mineral resource estimate, reported in accordance with the requirements of the JORC Code (2012 edition) for its 70 percent owned Kulon Progo iron sands project in Yogyakarta.

A summary of the resource estimate is set out in the following table.

Block Stratigraphy Category Volume Dry Tonnes Fe TiO2 V2O5
(,000 m3) (,000 t) (%) (%) (%)
Resource Block Surface Sand Measured 29,044 55,370 12.56 1.65 0.06
Indicated 77,800 150,600 14.17 1.87 0.07
Total 106,900 206,000 13.74 1.81 0.07
Mining Boundary Surface Sand Measured 22,015 42,079 12.37 1.62 0.06
Indicated 67,900 131,600 14.15 1.87 0.07
Total 89,900 173,700 13.72 1.81 0.07

The company said in a statement that the Resource Block is defined as all areas of the Resource defined within the concession by the exploration drilling at a 9 percent Total Fe cut-off. The Mining Boundary is defined as the Resource Block, minus a 200-metre buffer zone (required by Indonesian regulations) between the high tide mark and the allowed mining area boundary at a 9 percent Total Fe cut-off.

In addition, there are Resources within the concession hosted within the Gravel underlying the Surface Sand. This gravel layers also contains lower grades of Total Fe. The Resource estimate for the Gravel horizon is set out in the following table.

Block Stratigraphy Category Volume Dry Tonnes Fe TiO2 V2O5
(,000 m3) (,000 t) (%) (%) (%)
Resource Block Gravel Indicated 188,500 327,600 7.22 0.90 0.03
Mining Boundary Gravel Indicated 150,300 261,900 7.23 0.90 0.03

The Resource Block is defined as all areas of the Resource defined within the concession by the exploration drilling at a 5 percent Total Fe cut-off. The Mining Boundary is defined as the Resource Block, minus a 200-metre buffer zone (required by Indonesian regulations) between the high tide mark and the allowed mining area boundary at a 5 percent Total Fe cut-off.

The resource estimate has been prepared by Brett Gunter of PT GMT Indonesia.

PT GMT Indonesia was requested by Indo Mines Limited (IML) to conduct a technical review and Resource estimation of the PT Jogja Magasa Iron (JMI) concssion area. The prospect area lies within the Daerah Istimewa Yogyakarta (DIY, Special Region of Yogyakarta), Indonesia. The Kulon Progo Project is a joint venture between Indo Mines Limited (70%) and PT Jogja Magasa Mining (JMM, 30%).

The following Resource estimate is made for the JMI CoW concession area, date stamped September 25, 2015. We believe the Resource estimate is robust and fully represents the exploration data and current geological situation within the JMI CoW concession area. The Resource estimates made are global estimates. The Resource estimates are reported in accordance with the requirements of the JORC Code (2102) edition.

Editing by Reiner Simanjuntak

Share this story

Tags:

Related News & Products