Limau Field?s production at 13,473 bopd

Saturday, April 27 2013 - 02:39 AM WIB

By Romel S. Gurky

PT Pertamina EP Asset 2 Limau Field held a gathering recently to celebrate the successful spudding of NR-38 well and Limau Field?s production that has now reached 13,473 bopd.

The NR-38 well, which is located in Niru village, Tebat Agung, Muara Enim, was spudded with a horizontal drilling method at a depth of 2009 mMD/1616.29 mTVD on the X2 layer, the company said in a statement this week.

The drilling was carried out using Emsco D2-38 rig belonging to PT Pertamina Drilling Service Indonesia (PDSI).

Editing by Dadan Wijaksana

Share this story

Tags:

Related News & Products