NO. |
NAME OF PROJECT |
VOLTAGE (kV) |
ESTIMATED LENGTH (kms) |
|
FROM |
TO |
|||
1 |
PLTU Indramayu |
Cibatu |
500 |
270 |
2 |
Pump Storage Upper Cisokan |
Incomer Cibinong ? Saguling |
500 |
60 |
3 |
PLTP Tangkuban Perahu I |
Bandung Utara |
150 |
10 |
4 |
PLTP Ijen |
Banyuwangi |
150 |
60 |
5 |
PLTP Iyang Argopuro |
Probolinggo |
150 |
30 |
6 |
PLTP Wilis /Ngebel |
Pacitan 2 |
150 |
60 |
7 |
PLTA Asahan 3 |
Simangkok |
150 |
22 |
8 |
PLTU Pangkalan Susu 3 & 4 |
Pangkalan Brandan |
150 |
22 |
9 |
PLTP Singa Penuh |
Sungai Penuh |
150 |
20 |
10 |
PLTP Hululais |
Pekalongan |
150 |
120 |
11 |
PLTU Sampit |
Sampit |
150 |
40 |
12 |
PLTP Kotamobagu |
Otam |
150 |
32 |
13 |
PLTP Sembalun |
GI Pringgabaya |
150 |
60 |
14 |
PLTP Tulehu |
Incomer Waai-Paso |
70 |
40 |
Note:
PLTU : coal-fired power plant
PLTP : geothermal power plant
PLTA : hydropower plant
PLTG : gas turbine power plant
PLTGU : combined cycle power plant