The following is the list of transmission projects related to the renewable energy, coal and gas-fired power plants to be built by state owned electricity firm PT Perusahaan Listrik Negara (PLN) under the Phase Two 10,000 MW crash program:

NO.

NAME OF PROJECT

VOLTAGE

(kV)

ESTIMATED LENGTH

(kms)

FROM

TO

1

PLTU Indramayu

Cibatu

500

270

2

Pump Storage Upper Cisokan

Incomer Cibinong ? Saguling

500

60

3

PLTP Tangkuban Perahu I

Bandung Utara

150

10

4

PLTP Ijen

Banyuwangi

150

60

5

PLTP Iyang Argopuro

Probolinggo

150

30

6

PLTP Wilis /Ngebel

Pacitan 2

150

60

7

PLTA Asahan 3

Simangkok

150

22

8

PLTU Pangkalan Susu 3 & 4

Pangkalan Brandan

150

22

9

PLTP Singa Penuh

Sungai Penuh

150

20

10

PLTP Hululais

Pekalongan

150

120

11

PLTU Sampit

Sampit

150

40

12

PLTP Kotamobagu

Otam

150

32

13

PLTP Sembalun

GI Pringgabaya

150

60

14

PLTP Tulehu

Incomer Waai-Paso

70

40

Note:

PLTU : coal-fired power plant
PLTP : geothermal power plant
PLTA : hydropower plant
PLTG : gas turbine power plant
PLTGU : combined cycle power plant

Share this story

Tags:

Related News & Products