Medco penetrates 147 net ft of coal at S. Sumatra CBM block
Wednesday, May 4 2011 - 02:00 PM WIB
More than 20 coal core samples are undergoing gas content desorption, the company said.
On-site contractor Core Laboratories N.V. estimates gas content of up to 96 ft(3)/ton (as-received basis). As desorption continues, final gas contents are likely to be in excess of 100 ft(3)/ton (dry, ash-free basis), the company said.
The new gas content data confirm the high (93%) coal seam gas saturation level measured by Weatherford International Ltd. at the CBM-SE-02 well, located 7 km northeast of the CBM-SE-04 well.
The coal cores, recovered from the Palembang B coal interval at an average depth of 2,100 feet, were observed to be naturally fractured and effervesced gas bubbles at the surface, which may indicate good gas content and permeability.
Medco Energi now plans to core the nearby CBM-SE-01 and CBM-SE-03 wells, which already have been pre-drilled and cased to the top of the coal section.
Final gas content measurements for the three wells are expected to become available during the coming weeks, after which the Company plans to engage the services of a Qualified Reserves Evaluator to audit the coalbed methane resources of the block based on Canadian Standards of Disclosure for Oil and Gas Activities.
Medco is the operator of Sekayu CBM PSC with 50 percent interest.(alex)
