Medco?s weekly drilling & exploration activities

Wednesday, January 18 2006 - 05:54 AM WIB

PT MEDCO ENERGI INTERNASIONAL TBK & SUBSIDIARIES
WEEKLY DRILLING & EXPLORATION ACTIVITIES
Week ending January 13, 2006

 

 

EXPLORATION / APPRAISAL WELLS

Resik-1, Tuban PSC JOB, East Java, Indonesia

Interest

25% through PT Medco E&P Tuban

Operator

PetroChina International

Type

Oil and Gas Development

Status at 0600hrs

Drilling 17?" pilot hole at 4013'

Next Plan

Continue drilling

 

 

Sesayap-B1, Simenggaris JOB, NE Kalimantan, Indonesia

Interest

62.5% through PT Medco Simenggaris Ltd

Operator

PT Medco E&P Indonesia

Type

Oil and Gas Development

Status at 0600hrs

Drilling 8?" hole to 3576' in Tabul Formation

Next Plan

Continue drilling to TD, logging.

  

Senoro-4B, Tomori Block JOB, Central Sulawesi, Indonesia

Interest

50% through PT Medco Tomori Sulawesi

Operator

PT Medco E&P Indonesia

Type

Oil and Gas Development

Status at 0600hrs

Drilling 8?" hole to TD at 6953'MD, run wireline logs.

Next Plan

Run 7" casing, testing.

  
Gesang-1, Merangin-1 PSC, Jambi, Indonesia

Interest

41% through PT Medco E&P Merangin

Operator

PT Medco E&P Merangin

Type

Oil and Gas Exploration

Status at 0600hrs

Shut in well

Next Plan

Continue testing.

 

Anyelir-1, South Sumatra Extension PSC, South Sumatra, Indonesia

Interest

100% through PT Medco E&P Indonesia

Operator

PT Medco E&P Indonesia

Type

Oil and Gas Exploration

Status at 0600hrs

Drilled 8?" hole to TD of 2754', run wireline logs, prepare to run 7" casing.

Next Plan

Run 7" casing, release rig and test with workover rig.

  

 

 

DEVELOPMENT WELLS

S Pamusian 2005-1, Tarakan PSC, East Kalimantan, Indonesia

Interest

100% through PT Medco E&P Kalimantan

Operator

PT Medco E&P Kalimantan

Type

Oil Development

Status at 0600hrs

Drilled to 1291m, run 9 5/8" casing, prepare to drill 8?" hole.

Next Plan

Drilling to TD

  

Kaji Semoga 2005-24, Rimau Block PSC, South Sumatra, Indonesia

Interest

95% through PT Medco E&P Indonesia

Operator

PT Medco E&P Indonesia

Type

Oil Development

Status at 0600hrs

Run 7" casing, rig released.

Next Plan

Rig moved

 

 

Kaji Water Flood 2006-6, Rimau Block PSC, South Sumatra, Indonesia

Interest

95% through PT Medco E&P Indonesia

Operator

PT Medco E&P Indonesia

Type

Oil Development

Status at 0600hrs

Drilled 8?" hole to TD of 3466' Measured Depth, run 7" casing, rig released.

Next Plan

Moved and drill KWF 2005-2.

  

Kaji Semoga 2005-25, Rimau Block PSC, South Sumatra, Indonesia

Interest

95% through PT Medco E&P Indonesia

Operator

PT Medco E&P Indonesia

Type

Oil Development

Status at 0600hrs

Drilling 8?" hole to TD of 3380', trip for log.

Next Plan

Complete logs, run 7" casing, rig release.

  

Kaji Semoga 2006-12, Rimau Block PSC, South Sumatra, Indonesia

Interest

95% through PT Medco E&P Indonesia

Operator

PT Medco E&P Indonesia

Type

Oil Development

Status at 0600hrs

Drilling 12?" hole to 1503'

Next Plan

Run 9 5/8" casing, drill to TD.

Share this story

Tags:

Related News & Products