Medco's weekly drilling & exploration activities
Monday, January 30 2006 - 10:41 AM WIB
WEEKLY DRILLING & EXPLORATION ACTIVITIES
Week ending 27 January 2006
EXPLORATION / APPRAISAL WELLS
Gesang-1
Gesang-1 is located in Merangin Block, Jambi. The operator is PT Medco E&P Merangin. Medco?s shared in this block is 41% through PT Medco E&P Merangin.
The status of the well is continuing shut in well. The next plan is to continue testing.
Anyelir-1
Anyelir-1 is located in South Sumatera Extension Block, South Sumatera. The operator is PT Medco E&P Indonesia. Medco?s shared in this block is 100% through PT Medco E&P Indonesia.
The status of the well waiting for service rig to complete the well. The next plan is continue testing.
Fariz-3
Fariz-3 is located in South Sumatera Extension Block, South Sumatera The operator is PT Medco E&P Indonesia. Medco?s shared in this block is 100% through PT Medco E&P Indonesia.
The status of the well is continuing shut in well for pressure build up. The next plan is terminate test, suspend the well as oil/gas well.
Resik-1
Resik-1 is located in Tuban Block, East Java. The operator is Petrochina International. Medco?s shared in this block is 25% through PT Medco E&P Tuban.
The status of the well is drilling with 12?? bit to 4798?. The next plan is to drill 12?? bit to section TD of 8495?, run wireline log, set 9 5/8? casing and drill ahead w/ 8?? bit.
Sesayap-B1
Sesayap-B1 is located in Simenggaris Block, East Kalimantan. The operator is PT Medco E&P Indonesia. Medco?s shared in this block is 62.5% through PT Medco Simenggaris Ltd.
The status of the well is drilling 8?? hole to 6026? (TD), run wireline logs. The next plan is to complete running wireline logging, evaluate log results and decide whether running 7? liner or not.
Senoro-4B
Senoro-4B is located in Tomori Block, Central Sulawesi. The operator is PT Medco E&P Indonesia. Medco?s shared in this block is 50% through PT Medco Tomori Sulawesi.
The status of the welt is ran 7? casing to 6953?MD, continued with running DST (drill stem test) and test DST #1 interval 6674-6690? MD. The next plan is continue testing.
DEVELOPMENT WELLS
South Pamusian 2005-1
South Pamusian 2005-1 is located in Tarakan Block, Tarakan. The operator is PT Medco E&P Indonesia. Medco?s shared in this block is 100% through PT Medco E&P Tarakan.
The status of the well is drilled 8 ?? hole to 2282mMD/ 2204mTVD (7? casing point), run wireline resistivity log, preliminary log evaluation indicates all potential reservoir in these section are wet, the operation then continue with conditioning hole prior to run 7? liner. The next plan is to run 7? casing, and drill 6? hole to final TD.
Semoga Water Flood (SWF) 2006-12
Semoga Water Flood (SWF) 2006-12 is located in Rimau Block, South Sumatera. The operator is PT Medco E&P Indonesia. Medco?s shared in this block is 100% through PT Medco E&P Rimau.
The status of the well is run casing 7? and release rig.. The next plan is to complete the well with the service rig.
Semoga Water Flood (SWF) 2006-14
Semoga Water Flood (SWF) 2006-14 is located in Rimau Block, South Sumatera. The operator is PT Medco E&P Indonesia. Medco?s shared in this block is 100% through PT Medco E&P Rimau.
SWF 2006-14 well spudded on January 22, 2006 drilled 17?? hole and ran 13 3/8? casing to 108?, drilled 12 ?? hole run 9 5/8? casing to 1382?.
The status of the well is drilling with 8?? bit to 2917?MD/2478?TVD. The next plan is to drill TD, run wireline logs and run 7? production casing.
Semoga Water Flood (SWF) 2006-06
Semoga Water Flood (SWF) 2006-06 is located in Rimau Block, South Sumatera. The operator is PT Medco E&P Indonesia. Medco?s shared in this block is 100% through PT Medco E&P Rimau.
SWF 2006-06 well spudded on January 22, 2006 drilled 17?? hole and ran 13 3/8? casing to 127?, drilled 12 ?? hole run 9 5/8? casing to 1440?.
The status of the well is drilling with 8?? bit to 1997?MD/1946?TVD. The next plan is to drill TD, run wireline logs and run 7? production casing.
Kaji Semoga (TS) 2006-05
Kaji Semoga (TS) 2006-05 is located in Rimau Block, South Sumatera. The operator is PT Medco E&P Indonesia. Medco?s shared in this block is 100% through PT Medco E&P Rimau.
SWF 2006-05 well spudded on January 19, 2006 drilled 17?? hole and ran 13 3/8? casing to 121?, drilled 12 ?? hole run 9 5/8? casing to 1531?.
The status of the well is drilling with 8?? bit to 3212?MD/2904?TVD (TD), encountered the main objective Telisa sand at 3025?MD, which had fair oil shows observed from cuttings; while Baturaja Limestone as secondary objective encountered at 3095?MD. The next plan is to run wireline logs and run 7? production casing. (end of release)
