Medco?s weekly drilling & exploration activities
Tuesday, November 15 2005 - 02:31 PM WIB
WEEKLY DRILLING & EXPLORATION ACTIVITIES
Week ending November 11, 2005
? |
? |
EXPLORATION / APPRAISAL WELLS | |
Mudi B-24, Tuban PSC JOB, East Java, Indonesia | |
Interest |
25% through PT Medco E&P Tuban |
Operator |
PetroChina International |
Type |
Oil and Gas Development |
Status at 0600hrs |
Drilling directionally 12 ?" hole to 6540' MD (KOP at 6500' MD) |
Next Plan |
Drilling 12 ?" hole to 9 5/8" csg poit. |
? |
? |
Jata-4ST, South Sumatra Extension PSC, South Sumatra, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Perforated interval 5318-5330', last rate flowed on 16/64" chk 2 bbls/hr condensate, WC 10%, cumulative recovery 61 bbls, R/D rig |
Next Plan |
Open well for stable rate, run SBHP |
| ? | ? |
| Gesang-1, Merangin-1 PSC, Jambi, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Opening hole to 17?" bit |
Next Plan |
Run 13 3/8" casing, drill head w/ 12 ?" bit to 9 5/8" casing point. |
| ? | ? |
? |
? |
DEVELOPMENT WELLS | |
Tiaka-6, Senoro Toili PSC JOB, Central Sulawesi, Indonesia | |
Interest |
50% through PT Medco E&P Tomori Sulawesi |
Operator |
JOB PERTAMINA - Medco E&P Tomori Sulawesi |
Type |
Oil Development |
Status at 0600hrs |
RIH w/ 6" bit and 7" scrapper, DOC from 7359' to TOL at 7450' |
Next Plan |
Recompletion. |
? |
? |
Mamburungan - 2005-2, Tarakan PSC, East Kalimantan, Indonesia | |
Interest |
100% through PT Medco E&P Kalimantan |
Operator |
PT Medco E&P Kalimantan |
Type |
Oil Development |
Status at 0600hrs |
Drilling out cement inside 4?" liner to 2330m |
Next Plan |
Perforate and test. |
? |
? |
Kaji Semoga 2005-33, Rimau Block PSC, South Sumatra, Indonesia | |
Interest |
95% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil Development |
Status at 0600hrs |
Moving rig to staging area for maintenance. |
Next Plan |
Maintenance rig. |
? | ? |
Kaji Semoga Water Flood 2005-1, Rimau Block PSC, South Sumatra, Indonesia | |
Interest |
95% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil Development |
Status at 0600hrs |
Rigging up. |
Next Plan |
Spud well and drill KWF 2005-1. |
? | ? |
Matra D-4, Rimau Block PSC, South Sumatra, Indonesia | |
Interest |
95% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil Development |
Status at 0600hrs |
Drilling 8 ?" sidetrack Matra D4 ST at 3400' |
Next Plan |
Drill 8 ?" sidetracking toTD, run wireline log. |
? |
? |
? |
? |
SEISMIC SURVEY | |
Tarakan 2D/3D, Tarakan TAC, East Kalimantan, Indonesia | |
Interest |
100% through PT Medco E&P Tarakan |
Operator |
PT Medco E&P Tarakan |
Type |
2D/3D Seismic Survey |
Activities |
3D Survey: Completed |
Next Plan |
Continue with drilling shothole (2D survey area). |