Medco?s weekly drilling & exploration activities
Tuesday, November 22 2005 - 08:08 AM WIB
WEEKLY DRILLING & EXPLORATION ACTIVITIES
Week ending November 18, 2005
? |
? |
EXPLORATION / APPRAISAL WELLS | |
Mudi B-24, Tuban PSC JOB, East Java, Indonesia | |
Interest |
25% through PT Medco E&P Tuban |
Operator |
PetroChina International |
Type |
Oil and Gas Development |
Status at 0600hrs |
Drilling directionally 12 ?" hole to 8470' MD / 8286' TVD |
Next Plan |
Drilling 12 ?" hole to 9 5/8" csg poit. |
? |
? |
Jata-4ST, South Sumatra Extension PSC, South Sumatra, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Shut in well for PBU, while waiting for separator. |
Next Plan |
Open well for stable rate, run deliverability test. |
| ? | ? |
Rengas-1, South Sumatra Extension PSC, South Sumatra, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Open well on 32/64" choke; Last rate: 24/64" chk, WHP: 400 psi, Sep pressure: 200 psi; Gas: 1.09 MMCFD, BFPD: 83.5, WC: 0% |
Next Plan |
Run deliverability test. |
| ? | ? |
| Gesang-1, Merangin-1 PSC, Jambi, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Run 13 3/8" casing, modification and repair several rig parts |
Next Plan |
Drill ahead w/ 12 ?" bit to 9 5/8" casing point. |
? | |
Fariz-3, South Sumatra Extension PSC, South Sumatra, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Opening hole to 12 ?" at 2278' MD/1996' TVD. |
Next Plan |
Run 9 5/8" casing, drill 8 ?" hole to TD, logging. |
| ? | ? |
? |
? |
DEVELOPMENT WELLS | |
Tiaka-6, Senoro Toili PSC JOB, Central Sulawesi, Indonesia | |
Interest |
50% through PT Medco E&P Tomori Sulawesi |
Operator |
JOB PERTAMINA - Medco E&P Tomori Sulawesi |
Type |
Oil Development |
Status at 0600hrs |
Run Cool Tubing Unit. |
Next Plan |
Acidized, recompletion well. |
? |
? |
Mamburungan - 2005-2, Tarakan PSC, East Kalimantan, Indonesia | |
Interest |
100% through PT Medco E&P Kalimantan |
Operator |
PT Medco E&P Kalimantan |
Type |
Oil Development |
Status at 0600hrs |
Perforate interval 2335-2339m, shut in well. |
Next Plan |
R/D drilling rig, test w/ service rig. |
? |
? |
Kaji Semoga Water Flood 2005-1, Rimau Block PSC, South Sumatra, Indonesia | |
Interest |
95% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil Development |
Status at 0600hrs |
Drilling at 3085' MD / 8256' TVD |
Next Plan |
Drill to TD, run wireline log, evaluate logs. |
? | ? |
Matra D-4, Rimau Block PSC, South Sumatra, Indonesia | |
Interest |
95% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil Development |
Status at 0600hrs |
Conditioning hole to run 7" production casing |
Next Plan |
Run 7" casing and test. |
? |
? |
? |
? |
SEISMIC SURVEY | |
Tarakan 2D/3D, Tarakan TAC, East Kalimantan, Indonesia | |
Interest |
100% through PT Medco E&P Tarakan |
Operator |
PT Medco E&P Tarakan |
Type |
2D/3D Seismic Survey |
Activities |
3D Survey: Completed
|
Next Plan |
Continue with drilling shothole (2D survey area). |
