Medco?s weekly drilling & exploration activities
Tuesday, December 13 2005 - 02:59 PM WIB
WEEKLY DRILLING & EXPLORATION ACTIVITIES
Week ending December 9, 2005
? |
? |
EXPLORATION / APPRAISAL WELLS | |
Mudi B-24, Tuban PSC JOB, East Java, Indonesia | |
Interest |
25% through PT Medco E&P Tuban |
Operator |
PetroChina International |
Type |
Oil and Gas Development |
Status at 0600hrs |
Drilling w/ 8?" bit to TD of 9372'MD/8950'TDV, run wireline logs, Condition hole with bit, POOH, RIH w/ completion string, set 9 5/8" packer at 9071'MD. Swabbing |
Next Plan |
Continue testing. |
? |
? |
Jata-4ST, South Sumatra Extension PSC, South Sumatra, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Shut in well for PBU, while waiting for separator. |
Next Plan |
Open well for stable rate, run deliverability test. |
| ? | ? |
Rengas-1, South Sumatra Extension PSC, South Sumatra, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
POOH w/ 2 7/8" tubing, set pressure test drillable bridge plug at 3910'. Set and tested 7" packer at 3673'. N/U X'mast tree and test. |
Next Plan |
Continue testing PERF #2. |
| ? | ? |
| Gesang-1, Merangin-1 PSC, Jambi, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Drilling 8?" hole at 5611'MD/TVD. |
Next Plan |
Drill ahead w/ 8?" bit to TD. |
| ? | |
Fariz-3, South Sumatra Extension PSC, South Sumatra, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Drilling rig released and moving to Anyelir-1 exploratory well. |
Next Plan |
Testing by the rig service. |
| ? | ? |
Anyelir-1, South Sumatra Extension PSC, South Sumatra, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Moving. |
Next Plan |
Spud in well, drilling 17?" hole. |
| ? | ? |
? |
? |
DEVELOPMENT WELLS | |
S Pamusian 2005-1, Tarakan PSC, East Kalimantan, Indonesia | |
Interest |
100% through PT Medco E&P Kalimantan |
Operator |
PT Medco E&P Kalimantan |
Type |
Oil Development |
Status at 0600hrs |
Moving to S Pamusian 2005-1. |
Next Plan |
Drilling at S Pamusian 2005-1. |
? |
? |
Kaji Water Flood 2005-3, Rimau Block PSC, South Sumatra, Indonesia | |
Interest |
95% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil Development |
Status at 0600hrs |
Drilled 8?" hole to TD of 3839'MD/3055'TVD, run wireline log, run 7" casing N/U X'mast tree, rig released and moving to SWF 2005-2 well. |
Next Plan |
Testing by the rig service. |
| ? | ? |
Semoga Water Flood 2005-2, Rimau Block PSC, South Sumatra, Indonesia | |
Interest |
95% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil Development |
Status at 0600hrs |
Spudded in well, drilled 17?" hole to 125'. Circ to run 13 3/8" casing. |
Next Plan |
Run 13 3/8" casing, drill ahead w/ 12? bit, run 9 5/8" casing. |
| ? | ? |
Kaji Semoga 2005-28, Rimau Block PSC, South Sumatra, Indonesia | |
Interest |
95% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil Development |
Status at 0600hrs |
Spudded in well, ran 13 3/8" and 9 5/8" casing, drill ahead w/ 8?" bit to 2175'MD/1877'TVD. |
Next Plan |
Drill to TD, logging, run 7" casing. |
| ? | ? |
? |
? |
SEISMIC SURVEY | |
Tarakan 2D/3D, Tarakan TAC, East Kalimantan, Indonesia | |
Interest |
100% through PT Medco E&P Tarakan |
Operator |
PT Medco E&P Tarakan |
Type |
2D/3D Seismic Survey |
Activities |
3D Survey: Completed |
Next Plan |
Continue with drilling shothole (2D survey area). |
