Medco?s weekly drilling & exploration activities
Wednesday, December 21 2005 - 10:52 AM WIB
WEEKLY DRILLING & EXPLORATION ACTIVITIES
Week ending December 16, 2005
? |
? |
EXPLORATION / APPRAISAL WELLS | |
Mudi B-24, Tuban PSC JOB, East Java, Indonesia | |
Interest |
25% through PT Medco E&P Tuban |
Operator |
PetroChina International |
Type |
Oil and Gas Development |
Status at 0600hrs |
Rigging down and prepare to move to Resik-1 exploratory well. |
Next Plan |
Spud in and drill Resik-1 well. |
? |
? |
Jata-4ST, South Sumatra Extension PSC, South Sumatra, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Open well, last rate on Perf int 5318'-5330' 32/64" choke. WHP 1050 psi 5.00 MMSCFD 6 bbl/hr condensate. Shut in well for PBU. |
Next Plan |
Open well for stable rate, run deliverability test. |
| ? | ? |
Rengas-1, South Sumatra Extension PSC, South Sumatra, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Perf int 3841'-3849', swabbed rec 20bbls 100% 10.1ppg Salt Water. Reperforated int 3841'-3849', swabbed total rec 23.2bbls 10ppg Salt Water (possible completion fluid). Perf int 3841'-3849', commingled w/ 3826'-2832', swabbed rec 8.7bbls 100% 9.0ppg SW, Shut in 1 hr, WHP 40psi, bled off press, gas only. Swab the well, recovered 0.5blls 9.0ppg SW, SIW, SITP 480psi |
Next Plan |
Open well, continue swabbing. |
| ? | ? |
| Gesang-1, Merangin-1 PSC, Jambi, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Drilling 8?" hole at 7363'MD/TVD. Baturaja Limestone entered at 7215'MD (-7044'SS), had gas and oil shows from cuttings. |
Next Plan |
Drill ahead w/ 8?" bit to TD. |
| ? | |
Anyelir-1, South Sumatra Extension PSC, South Sumatra, Indonesia | |
Interest |
100% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil and Gas Exploration |
Status at 0600hrs |
Moving and rigging up. |
Next Plan |
Spud in well, drilling 17?" hole. |
| ? | ? |
? |
? |
DEVELOPMENT WELLS | |
S Pamusian 2005-1, Tarakan PSC, East Kalimantan, Indonesia | |
Interest |
100% through PT Medco E&P Kalimantan |
Operator |
PT Medco E&P Kalimantan |
Type |
Oil Development |
Status at 0600hrs |
Moving to S Pamusian 2005-1. |
Next Plan |
Drilling at S Pamusian 2005-1. |
? |
? |
Semoga Water Flood 2005-2, Rimau Block PSC, South Sumatra, Indonesia | |
Interest |
95% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil Development |
Status at 0600hrs |
Drilled 12?" bit, run 9 5/8" casing and drill ahead to TD of 2804'MD/2710'TVD, ran wireline log, RIH w/ 8?" casing to clean out hole prior to run 7" casing. |
Next Plan |
Run 7" casing, R/D and release rig. |
| ? | ? |
Kaji Semoga 2005-29, Rimau Block PSC, South Sumatra, Indonesia | |
Interest |
95% through PT Medco E&P Indonesia |
Operator |
PT Medco E&P Indonesia |
Type |
Oil Development |
Status at 0600hrs |
Spudded in well, ran 13 3/8" and 9 5/8" casing, N/U "A" section. |
Next Plan |
Drill to TD, logging, run 7" casing. |
| ? | ? |
? |
? |
SEISMIC SURVEY | |
Tarakan 2D/3D, Tarakan TAC, East Kalimantan, Indonesia | |
Interest |
100% through PT Medco E&P Tarakan |
Operator |
PT Medco E&P Tarakan |
Type |
2D/3D Seismic Survey |
Activities |
3D Survey: Completed |
Next Plan |
Continue with drilling shothole (2D survey area). |
