Mineral Resource updates resources for Asmar, Belinau & Buluh

Monday, February 3 2014 - 06:43 AM WIB

By Ruli Setiawan

ASX-listed Sumatra Copper & Gold Plc announced on Friday updates to the mineral resource estimates for the Belinau, Asmar and Buluh deposits in December, bringing the mineral resource estimates in-line with the 2012 JORC reporting requirements.

?The updates are part of the life-of-mine (LOM) drilling program, which continues to be carried out by the company,? the firm said in its 2013 fourth quarter report.

The Belinau, Asmar and Buluh deposits are located in the Tembang project in Bengkulu.

The new Mineral Resources are summarised below:

Asmar Resource

Resource Category Tonnes Grade Au g/t Grade Ag g/t Contained Gold (oz) Contained Silver (oz)
Measured ? ? ? ? ?
Indicated 1,606,000 1.2 21 62,000 1,091,000
Inferred 1,547,000 1.4 13 69,000 657,000
Total 3,152,000 1.3 17 132,000 1,748,000
(Using a 0.5 g/t Au cut off)

Buluh Resource

Resource Category Mined Tonnes Grade Au g/t Grade Ag g/t Contained Gold (oz) Contained Silver (oz)
Measured 109,000 3.98 51 14,000 177,000
Indicated 236,000 2.4 30 18,000 227,000
Inferred 302,000 2.3 32 22,000 308,000
Total 647,000 2.6 34 54,000 712,000
(Using a 0.5 g/t Au cut off)

BelinauResource

Resource Category Mined Tonnes Grade Au g/t Grade Ag g/t Contained Gold (oz) Contained Silver (oz)
Measured 132,000 9.70 70 14,000 298,000
Indicated 139,000 9.0 77 40,000 346,000
Inferred 67,000 7.3 65 16,000 141,000
Total 338,000 8.9 72 97,000 785,000
(using a 2.78 g/t Au cut off as originally reported in August 2011 Resource)

Editing by Johannes Simbolon

Share this story

Tags:

Related News & Products