PEPC opens EPC tender for GPF at Jambaran-Tiung Biru fields

Monday, May 25 2015 - 04:17 AM WIB

By Romel S. Gurky

PT Pertamina EP Cepu (PEPC) invited companies, individually or in a consortium, to participate in prequalification tender for engineering, procurement and construction (EPC) works of gas processing facility (EPC-GPF) at the Jambaran-Tiung Biru fields in Central Java.

PEPC unveiled in a tender announcement Monday brief description of the EPC works and tender requirements as follows.

No Tender Number/Name Brief Description of Work Tender Requirements

1

S14LL2020 EPC GPF - Gas Processing Facility GPF EPC work covering flowline (Jambaran-Tiung Biru). Inlet Separation Unit, Dew Point Control Unit, Refrigeration Unit, Condensate Stabilization Unit (including condensate tank), Acid Gas Removal Unit (AGRU), Sales Gas. Dehydration Unit (DHU), Acid Gas Enrichment (AGE), Sulfur Recovery Unit (SRU), Tail Gas Unit (TGU), Sales Gas Compressor Unit, Incineration / Thermal Oxidizer (TOX), Utilities (power generating, water, pressurized air, lightning protection, fire protection equipment, station building), TrunkIines (condensate, produced water, raw water), Metering System, and other items of equipment. 1. Companies categorized as Large Domestic Business/BUMN/ BUMD/National (autonomous or in the form of consortium of Domestic Companies or a consortium of Domestic Company with a National Company and/or with a Foreign Company under the lead of the Domestic or National Company)

2. The prospective Bidders are classified under the Business Field/Subfield 01 .d.01 .02 Production Facilities in Oil, Gas and other Energy

3. Sufficient financial capacity

4. Able to meet a minimum of 40% Domestic Content (TKDN)

5. Experienced in the following areas:

? Similar EPC construction work.

? Gas facility processing project with a minimum capacity of 70 MMSCFD

? Handling the processing of gas containing a minimum of 20% CO2 and a minimum of 5000 ppm H2S (in one or more projects).

PEPC said that interested companies are required to submit the following documents:
1. Letter of request on company letterhead, signed by an authorized officer, stating, among others, the following:
- Request to take part in this tender
- Statement of ability to meet the 40% TKDN minimum requirement
- Indicating the contact person (PlC) by informing the name, telephone number(s), HP number, email-1 and email-2.
2. Copy of Company Memorandum of Incorporation and its amendment(s), validated by the authorized agencies/departments,
3. Copy of Certificate of Domicile
4. Copies of SIUJK and TDP
5. Copy of SKT Migas

Registration time: business days between 08.30 - 15.30 from 26 to 29 May 2015 at the office of PT. Pertamina EP Cepu, Patra Office Tower Lt.5 Wing 3, Jl. Gatot Subroto Kav 32-34 Jakarta 12950. Phone No: 021 52 900 900.

Details on registration and other information with respect to this tender may be viewed at the company announcement board or at the www.pertamina-epcepu.com website and the SKK Migas website.

Only companies that meet the registration requirements set forth above will be invited to take part in the qualification process, and only companies that meet the qualifications will be invited to take part in the subsequent tender process.

As had been reported previously by this portal, gas production from the Jambaran-Tiung Biru fields is projected to be delayed for several months from the original target of end 2018 to the first or second quarter of 2019.

Tiung Biru field is located within Pertamina EP?s Cepu operations area which is adjacent to the Cepu giant oil and gas block jointly operated by ExxonMobil Cepu Limited (EMCL), a unit of ExxonMobil Indonesia, and PEPC. The Jambaran gas field is located within the Cepu Block, which is operated by EMCL. EMCL and Pertamina EP agreed in September 2012 to unitize both fields.

Editing by Reiner Simanjuntak

Share this story

Tags:

Related News & Products