PLN: Invitation for PQ EPC works for a computerized coal blending system Suralaya power plant
Friday, May 9 2008 - 12:52 AM WIB
EPC WORKS FOR A COMPUTERIZED COAL BLENDING SYSTEM
SURALAYA COAL FIRED STEAM POWER PLANT
(?Suralaya CFSPP?)
1. PT. Indonesia Power as project owner (?Owner?), a wholly owned and subsidiary of PT. PLN (Persero), is a power company who owns about 9,000 MW installed capacity power plant in Java -Bali System, including the 3,400 MW Suralaya CFSPP.
2. The scope of works consists of design, engineering, procurement, construction and commissioning of a complete set of a Computerized Coal Blending System and integration of such system with the existing coal handling facilities in Suralaya CFSPP, including all needed interfacing materials and devices, that are capable to supply approximately 2,000 ton/hr blended coal to 7 (seven) Units of the Suralaya CFSPP (?Project?).
3. The Project is listed as high priority in PT. Indonesia Power?s Annual Budget Year 2008 and 2009.
4. Owner seeks qualified EPC Contractor(s) or Consortium(s) that have had experiences in Indonesia or overseas, in conducting similar works and scopes with the Project which is able to process coal blending with the capacity of at least 600 Ton/hr (?Applicant~?).
5. The Applicant shall have sound financial conditions and be able to demonstrate its financial strengths to complete the Project timely. Applicant is required to submit evidence of its financial strengths in the form of a Support Letter issued by a bank and/or its last two (2) years audited financial statements.
6. The Applicant shall be a qualified local company (?Bukan Golongan Usaha Kecil?); in the event such Applicant is a foreign company, it shall be in partnership with a qualified local company. The partnership should be in the form of a Joint Operation or a Consortium, as evidenced by a Consortium Agreement or a Joint Operation Agreement signed by authorized person from each member of the Consortium or Joint Operation.
7. Applicant is required to submit all data and information necessary to support and demonstrate Applicant?s qualification and ability to handle similar works as stipulated in point 4 above. The Owner may contact or make clarification to any third party or company who is referred to by the Applicant without requiring the Applicant?s consent or permission.
8. Registration and collection of Pre-Qualification Document will be available during working hours (8 am - 4 pm Western Indonesia Time), on May 6 to May 13, 2008 at:
Procurement Team - PT. Indonesia Power
Jl. Jendral Gatot Subroto, Kav. 18, 7th Floor
Jakarta 12950
Phone: + 62-21 -5267666 ext 3339 or ext. 8036
9. Collection of Pre-Qualification Document will be available after Applicant has made full payment of IDR 10,000,000 or equivalent and submitted original copy of a power of attorney if represented by unauthorized person.
10. Applicant shall submit documentations as required in the Pre-Qualification Document by the latest on June 9, 2008 at 12.00 pm Western Indonesia Time. All documents submitted later than the submission deadline shall be rejected.
11. All submitted documents will become the Owner?s properties. Owner shall reserve the right to reject any Application that is deemed unqualified in the Owner?s sole opinion. (end)
