INVITATION FOR RE-PREQUALIF1CATION
KERAMASAN POWER PLANT EXTENSION PROJECT
Construction of 80MW Gas Fired Combined Cycle Power Plant (2x1-1-1)
JICA LOAN No. IP-527
1. The Government of Indonesia (GoI) through its executing agency ?PT PLN (Persero)? has received a loan under the Official Development Assistance (ODA) from Japan International Cooperation Agency (JICA) toward the cost of the captioned project.
2. PT. PLN (Persero) invites sealed application for re-pre-qualification from eligible bidders for the design, supply, transportation, construction, installation, testing and commissioning of the complete combined cycle power plant project under the following Contract Package:
Keramasan Power Plant Extension Project 80MW (2x1-1-1)
Palembang, South Sumatera
3. Re-pre-qualification is open to firms and voluntarily formed joint ventures and consortia from eligible nationals who have experience of successfully completed two (2) EPC contracts for Combined Cycle Power Plant of more than 80MW within the last fifteen (15) years. At least one (1) reference plant unit shall be installed in South East Asia, outside of his domicile country. The plant shall be in operation for at least two (2) years with a minimum of 7.500 hours or have a yearly availability factor of more than 80%.
4. The request must clearly state ?Request for Pre-qualification Documents for Engineering, Procurement and Construction (EPC) of the Keramasan Power Plant Extension Project, JICA Loan No. IP-527?.
5. The documents are available for a nonrefundable fee of Indonesian Rupiah Five Million (Rp 5.000.000) and Applicants may obtain the documents of ?Prequalification and Addendum 1? from the address below from December 24th 2008, within office hours.
PT PLN (PERSERO) KANTOR PUSAT
DIRECTORATE OF STRATEGIC CONSTRUCTION
Main, Building 10th Fl. Jl. Trunojoyo Blok M 1/135,
Kebayoran Baru, Jakarta 12160, INDONESIA
Telephone: +62-21-7251234 / Fax.: +62-21-7227025
The registered Firms or joint ventures or consortia who have obtained the Pre-qualification Document of August 21st, 2008 may obtain the Addendum 1 of the Pre-qualification Document from the same address.
6. Submissions of Applications for Re-pre-qualification, in one (1) original and two (2) copies, must be received in sealed envelopes or packages, either delivered by hand or by registered mail to the address above not later than February 16th, 2009, 2:00 p.m. Western Indonesian Standard Time, and be clearly marked ?Application to Pre-qualify for Keramasan Power Plant Extension Project, JICA Loan No. IP-527?.
7. Applicants will be advised, in due course of the results of their applications. Only firms and Joint Ventures and Consortia pre-qualified under this procedure will be invited to bid.
8. It is expected that invitations to Bid will be made in March 24th,, 2009.
Jakarta, December 24th, 2008