PLN: Invitation to bid for Muara Tawar combined-cycle power plant
Thursday, September 17 2009 - 12:11 AM WIB
INVITATION TO BID
FOR MUARA TAWAR COMBINED CYCLE POWER PLANT
BLOCK 2, 3 & 4 ADD-ON PROJECT
PT PLN (Persero) intends to invite the prospective Bidders to participate in Muara Tawar Combined Cycle Power Plant Block 2, 3 and 4 Add-On Project, hereinafter referred as The Muara Tawar Add-On Project which the project site located at Existing Muara Tawar Power Plant area, about 16km North of the city of Bekasi, Segara Jays Village, District Tarumajaya, Kabupaten Bekasi, West Java or approximately 12 km away from Tanjung Priok Harbor of Jakarta, Indonesia.
The Muara Tawar Add-On Project increases the power generation capacity by 1,200 MW converting from Open Cycle to highly efficient Combined Cycle with configuration 3:3:1, consisting one Gas Turbine Generator, nine Heat Recovery System Generators and three Steam Turbine Generators along with general facilities and an extended 500 kV switchyard. The Works under this Project comprising of engineering, manufacturing, procurement, supply, shop testing, erection, installation, testing, synchronizing, training, insurance, warranty, commissioning and project management in the turnkey basis.
This Project shall be financed under buyer?s credit financing scheme to finance a minimum of 85% of the total project cost, Providing the offer of finance supported by financial institutions is a mandatory requirement The budget allocation for this project is approximately USD 1 billion.
The Bidding is opened to a firm, Joint Venture/ Consortium/ Joint Operation under the international Competitive
Bidding will be conducted with single stage, two envelopes bidding procedure.
Eligible bidders must meet the following post qualification criteria as stipulated in the Bidding Document including:
1. The Bidder being a firm, JV or consortium, shall have an average annual turn over during the last five (5) years of not less than one billion US Dollar (US$1 ,000,000,000) to be confirmed by the financial data in the Bid Proposal.
2. The Bidder or leader of JV or Consortium must demonstrate that he has successfully completed at least two (2) add-on or combined cycle EPC Contracts, complying with the specifics:
a. Within the last fifteen (15) years (i.e. start of contract not earlier than 1994),
b. Outside the Bidder?s or Leader?s or Leader?s of a JV/Consortium home country,
c. At least one (1) EPC Contract shall be for a plant in South East Asia,
d. With a gas Turbine, in a power range of 110 MW- 165 MW (site condition) or larger GT,
e. Prototype equipment and system installed as experience is not acceptable.
3. Manufacturing and production capabilities.
Eligible bidders may obtain the bid document between 09.00 - 15.00 WIST starting from September 25, 2009 up to November 24, 2009, upon cash payment of a non refundable Ten Million Rupiah (Rp 10,000,000) at the following address:
PT PLN (PERSERO) KANTOR PUSAT
DIRECTOR OF STRATEGIC CONSTRUCTION
c/o Chief of Procurement Committee for Muara Tawar Add-On Project
Main Building 15Th Floor
Jl. Trunojoyo Blok M 1/135, Kebayoran Baru., Jakarta 12160, Indonesia
Tel: (62-21) 725-1234. 7250-550 ext 1836 Fax: (62-21) 7227060
The bid proposal must be sent in sealed envelopes, delivered by hand to the above mentioned address, not later than
November 25, 2009 at 14.00 WIST and the clearly marked ?Bid proposal of EPC-Contract for Muara Tawar Combined Cycle Power Plant Block 2, 3 & 4 Add-On Project?.
Jakarta, September 17, 2009
The Procurement Committee