PLN: PQ invitation for 500 KV overhead line Java-Bali crossing project

Thursday, July 4 2013 - 03:55 AM WIB

PT PLN (PERSERO)
INVITATION FO PRE QUALIFICATION
FOR
500 KV OVERHEAD LINE JAVA-BALI CROSSING PROJECT (WATU DODOL-SEGARA RUPEK)

PT PLN (Persero), intends to prequalify EPC Contractors from all over countries for following contract under 500 kV Overhead Line Java-Bali Crossing Project that will finance under PLN?s fund.

Prequalification will be conducted through prequalification procedures specified in the Prequalification Document and is open to all reputable applicants from all over countries. To be prequalified to participate in the bid, applicants shall meet the qualification criteria as specified in the prequalification documents, such as having experience in design, manufacture, and construction of long span EHV transmission line of no less than I 200 m, and having minimum average annual turnover of no less than USD60 million.

Interested prospective applicants may obtain further information and inspect the Prequalification Document at the address given below,

PT PLN (Persero) Kantor Pusat
Chairman of Procurement Committee for 500 kV Overhead Line Java-Bali Crossing Project

Main Building 15th Floor
Jln. Trunojoyo Blok M I-135, Kebayoran Baru, Jakarta 12160 , INDONESIA
Telephone: (021) 7261875, (021) 7251234, ext: 1862/1380;
Facs: +62.21.7227060
http://eproc.pln.co.id

The prequalification documents may be obtained in hardcopy in person by register from the above address by the prospective applicants themselves or their authorized representatives, upon payment of non-refundable fee of Rp.5.000.000 (five million rupiah).

Interest prospective applicants may collect the prequalification document at the address above starting from July 10, 2013 until 2 August, 2013 between 09.00-15.00 WIST,

Applicants shall submit their application in sealed envelopes and clearly marked ?Prequalification for 500 kV Overhead Line Java-Bali Crossing Project (Watu Dodol - Segara Rupek)? to the address above before or not later than August 16, 2013 at 10.00 am WIST , late applications will be rejected.

Jakarta, July 4, 2013
Procurement Committee