PLN: PQ invitation for Lontar power plant extension project

Thursday, June 5 2014 - 02:30 AM WIB

PT PLN (PERSERO)
INVITATION FOR PREQUALIFICATION
FOR PLTU LONTAR EXTENSION (1 x 315 MW) PROJECT

1. PLN (hereinafter referred to as the ?Owner?) intends to prequalify contractors for the design, execution and completion (including manufacture, delivery, testing before shipment, finishing, painting, packing for export, insuring, shipping, delivery to Indonesia, landing, customs clearing, transporting from the port to the Site, site storing, civil and building work, erection, site testing, commissioning and remedying all defects) of the PLTU Lontar Extension (1 x 315 MW) (hereinafter referred to as the ?Works?), with minimum Gross Output 300 MW and maximum Gross Output 315 MW. The Works are located at Lontar Village, Kemiri district, Tangerang Regency, Banten Province in Java island in Republic of Indonesia.

2. The proposed project will be financed by corporate loan to PLN or the minimum amount of 70% (excluding VAT) of the Contract Price and the remaining will be financed by PLN?s own budget. At least 50% of the loan portion shall be covered under Export Credit Agency and the remaining loan portion shall be covered by the lenders or any other sources without government guarantee and no collateral.

3. This Invitation to Prequalify is limited to firms and voluntarily formed consortiums, joint-ventures, joint-operations from the OECD (Organization for Economic Co-operation and Development) Country members which in diplomatic relation with Indonesia. The Applicant shall engage the reputable local company as a member of consortiums, joint-ventures, joint-operations.

4. The qualified Applicants criteria will be based on the satisfactory demonstration of, but not limited to:
a. EPC Contractor: successful experience as an EPC Contractor (in any joint venture, joint operation or consortium, a member of joint venture, joint operation or consortium with share of not less than 40%) in the design, manufacture, supply, installation, supervision, completion and commissioning on at least two (2) Coal Fired Steam Power Plant projects for lead partner in the last twenty (20) years, and successful operation for more than two (2) years with the following criteria:
i. Minimum gross output is 300 MW for each unit,
ii. using subcritical or supercritical Boiler, and
iii. at least one project shall be outside home country.

b. The Applicant shall fulfill minimum requirement of 5A2 rank by PT D & B for Leader and 5A3 rank by D & B for all members. The Applicant shall submit with his application recent valid certificate as evidence.

c. Joint ventures/Joint Operation or Consortium must comply with the following requirements:
(a) Lead partner must have more than 50% of the share of the Works
(b) Each member must have at least 20% of the share of the Works.

5. Eligible Applicants may register to collect the prequalification documents from June 5 - July 3, 2014, after payment of a non refundable fee in the amount of Rp. 10,000,000 (Indonesian Rupiah ten million only) at:

PT PLN (Persero) Head Office,
c/o Chairman of Procurement Committee of PLTU Lontar Extension (1 x 315 MW)
15th Floor, Main Building, Jalan Trunojoyo, Block M I/135, Kebayoran Baru,
Jakarta Selatan 12160, Indonesia,
Tel: +62(21)725 1234; Fax: +62(21)722 7060.

6. Submissions of Applications for Prequalification must be received in accordance with the requirements of the Instruction to Applicants in sealed envelopes, delivered by hand not later than: 14:00 WIST on July 4th 2014 to the above address and be clearly marked ?Application to Prequalify for PLTU Lontar Extension (1 x 315 MW) Project?.

Jakarta, June 5th, 2014
Procurement Committee for
PLTU LONTAR EXTENSION (1 x 315 MW) PROJECT
Share this story

Tags:

Related News & Products