PLN: PQ invitation for Peusangan 1 & 2 hydro power project
Thursday, April 1 2010 - 02:22 AM WIB
INVITATION TO PREQUALIFICATION
PEUSANGAN 1 & 2 HYDROELECTRIC POWER PLANT PROJECT
LOT II: METAL WORKS
JICA LOAN No. IP-538
1. The Government of Indonesia (GoI) through its executing agency ?PT. PLN (Persero)? has received a loan under the Official Development Assistance (ODA) from Japan International Cooperation Agency (JICA) toward the cost of the captioned project and allocated the loan Japanese Yen 1,630 million to Lot II, Metal Works.
2. PT. PLN (Persero) intends to pro-qualify International Contractor(s) specializing in metal works. The Peusangan 1 & 2 Hydroelectric Power Plant Project is located in the Aceh Province, and will provide electric power of 88 MW (2x22.5MW and 2x21.5MW) for the power grid of Northern Sumatra. The works will incorporate Metal Works comprising the hydro-mechanical equipment of gates, penstocks and valves:
Peusangan 1 & 2 Hydroelectric Power Plant Project
Lot II: METAL WORKS
Aceh Province, Indonesia
3. Pre-qualification is open to firms and voluntarily formed joint ventures and consortium from eligible countries who have successful previous experience in Southeast Asian countries at outside the Applicant?s registered home country or Indonesia in 1980 or later for:
(1) Metal works of at least two(2) power generation projects of 25MW or larger and at least one (1)hydroelectric power construction project among two (2) projects as follows:
1) Defects liability certificate or equivalent for two (2) projects issued by the Employer
2) Gates and penstocks have been operated successfully for two (2) years after completion
3) One (1) project was financed by JICA, World Bank or Asian Development Bank
4) One (1) project under ODA loan?s standard conditions of contract or the conditions of contract for electrical and mechanical works by FIDIC
(2) Overall engineering management, design, manufacture, installation, site test and commissioning of gates for at least one (1) hydropower plant construction project
(3) Overall engineering management, design, manufacture, installation, site test and commissioning of penstocks with bifurcation for a least one (1) hydropower plant construction project.
4. The documents are available for a nonrefundable fee of Indonesian Rupiah Five Million (Rp. 5,000,000) and Applicants may obtain the prequalification document from April 1, 2010, within office hours, from the address below:
PT. PLN (Persero) KANTOR PUSAT
DIRECTOR OF STRATEGIC PROCUREMENT
C/O HEAD OF STRATEGIC PROCUREMENT DIVISION
Main Building, 15th Fl. Jl. Trunojoyo Blok M I/135,
Kebayoran Baru, Jakarta 12160, INDONESIA
Telephone: +62-21 -7251 234/Fax.:+62-21-7227060
5. Submission of Applications for Pre-qualification, in one (1) original and two (2) copies, must be received in sealed envelopes or packages, either delivered by hand or by registered mail to the address above not later than May 17, 2010, within office hour, and be clearly marked ?Application to Pre-Qualification for Peusangan 1 & 2 Hydroelectric Power Plant Project Lot II: Metal Works, JICA Loan No. IP-538?.
6. Applicants will be advised, in due course, of the results of their applications. Only qualified Applicants will be invited to bid.
Jakarta, April 1, 2010
Procurement Committee