PLN: PQ invitation for PLTU Teluk Balikpapan 2x100 MW power plant

Friday, January 15 2010 - 12:42 AM WIB

PT PLN (PERSERO)
PRE-QUALIFICATION INVITATION
FOR PLTU KALIMANTAN TIMUR - TELUK BALIKPAPAN 2 X 100 MW
As part of 10.000 MW Acceleration Program

1. PT PLN (Persero) called ?PLN? hereby invites for Pre-Qualification for the design, engineering, procurement and construction, including commissioning of Coal Fired Steam Power Plants (CFSPP), using low rank coal. The project is as follow:

Project Title Gross Output (MW) COD unit 1 (Months) COD unit 2 (Months)
PLTU Kaltim - Teluk Balikpapan 2 x 100 30 33

2. PLN intends to Pre-Qualify Applicants as EPC Contractors in the form of Single Company, joint Venture/joint Operation or Consortium to undertake the engineering, procurement, construction, and commissioning including qualification of main equipment, boiler, steam turbine, generator, instrument & control, and 150 kV substation. The qualified Applicants will be invited for the International Competitive Bidding process (ICB) of the above project. The proposed project will be financed by PIN under his own fund.

3. The scope of works shall be on a turnkey basis, include but not limited to site investigation and site development, engineering, procurement of goods, construction, testing and commissioning, substation, related civil works, including the warranty. Detail of Scope of Work will be available on Pre Qualification Document.

4. Pre-qualification criteria will be based on the Applicant?s satisfactory demonstration of:

a. Successful as Contractor/Subcontractor for engineering, procurement, construction, commissioning and commercial operation for at least 2 (two) years of Coal Fired Steam Power Plant with project size of 50MW per unit or larger.

b. Successful experience of main equipment (i.e. Boiler, steam turbine, generator, instrument & control, and 150 kV substations) shall be proven at least demonstrated by 2 (two) years satisfactory operation by owner.

c. Financial capability as evidenced by audited balance sheet and profit/loss statement for the last 3 (three) years. The Applicant?s financial capability should be sound and satisfactory and shall be evaluated in term of net profit and total assets.

5. Applicant may register and collect the Prequalification document from January 18th, 2010 until February 26th, 2010, after payment of a non refundable fee in the amount of Rp 3.000.000,- (three million Rupiah) at:

6. Applications in one (1) original, three (3) copies and one (1) electronic copy shall be delivered by hand not later than 16:00 hours local time on March 1, 2010 to the above address in the sealed envelopes with clearly marked as mentioned as Project of point 1 above.

Jakarta, January 15th, 2010
Procurement Committee for CFSPP Projects Outside Java Bali