PRE-QUALIFICATION INVITATION
FOR RE-BIDDING OF PLTU 1 KALIMANTAN BARAT 2X50 MW
As part of 10,000 MW Acceleration Program

1. The Bid of the Coal Fired Steam Power Plant (CFSPP) for:

No Project Title Gross Output (MW)
1 PLTU 1 West Kalimantan 2 x 50

has been failed due to out of the regulation. PT PLN (Persero) called ?PLN? therefore invites the Prospective Applicants to follow Pre-qualification for Re-Bidding of above mentioned project.

2. PLN intend to Pre-Qualify Applicants as EPC Contractors in the form of Single Company, Joint Venture/Joint Operation or Consortium to undertake the engineering, procurement, construction, commissioning and project financing support. The qualified Applicants will be invited for the International Competitive Bidding process (ICB) of the above 2 (two) projects. The proposed projects will be financed by PLN under his own fund.

3. The scope of works shall be on a turnkey basis, include but not limited to site investigation and site development, engineering, procurement of goods, construction, testing and commissioning, substation, related civil works and marine works, including the warranty. The Commercial Operation Date (COD) and handover for the first Unit of each project shall be 24 months from the date of contract signing, the next Unit shall be completed within 2 months for the following first Unit.

4. Pre-Qualification criteria will be based on the Applicant?s satisfactory demonstration of:
a. Successful as Contractor/Subcontractor for engineering, procurement, construction, commissioning and commercial operation for at least 1 (one) year of Thermal Power Plant with project size of 25 MW per unit or larger.
b. Financial capability as evidenced by audited balance sheet and profit/loss statement for the last 2 (two) years. The Applicant?s financial capability should be sound and satisfactory and shall be evaluated in term of net profit and total assets.

5. In order to updated data, the qualified Applicants who passed the previous pre-qualification process, shall be participate to this pre qualification.

6. Applicant may register and collect the Prequalification document from Tuesday, May 06, 2008 until Thursday, May 15, 2008, after payment of a non refundable fee in the amount of Rp. 3.000.000,- (three million Rupiahs) at:

PT PLN (Persero)
c/o Chief of Procurement Committee for CSFPP Projects Outside Java Bali
2nd Building, 3rd Floor, Jalan Trunojoyo Blok MI/135, Kebayoran Baru, Jakarta 12160
Phone +6221-7261875, 7261122, ext 1891, Fax +6221-72786265

7. Applications in one (1) original and one (1) copy shall be delivered by hand not later than Friday, May 16, 2008 at 16.30 am WIST to the above address in the sealed envelopes with clearly marked as mentioned as Project of point 1 above.

Jakarta, May 5, 2008
Procurement Committee for CFSPP Projects outside Java and Bali