600-700 MW Power Projects

1

PLTU 1 Banten (1x600MW)

Suralaya, Banten

1. PT. Titan Mining energy

259.999

DKI, Rp 11 Billions

2. PT. Arutmin

266.823

Danamon, Rp 11 Billions

3. PT. Kasih Industri?

--

--

4. PT. Baramutiara Prima

248.300BCA, Rp 11 Billions

2

PLTU 2 Jawa Timur (1x600 MW)

Paiton, East Java

1.PT. Arutmin Indonesia

239.296?Danamon Rp 9.5 Billions

3

PLTU 2 Jawa Tengah (1x600 MW)

Tanjung Jati, Central Java

1. PT. Arutmin Indonesia

247.515Danamon, Rp 10 Billions

300-400 MW Power Projects

1

PLTU 1 Jawa Timur (2x300 MW)

Pacitan, East Java

1. PT. Arutmin Indonesia

269.353?Danamon, Rp 11.5 Billions

2

PLTU 3 Jawa Timur (2x300 MW)

Tuban, East Java

1. PT. Arutmin Indonesia

242.636Danamon, Rp 10,5 Billions

3

PLTU 1 Jawa Barat (3x300 MW)

Indramayu, West Java

1. PT. Arutmin Indoesia

259,164Danamon, Rp 16,5 Billions

2. PT. Kasih Industri?

247.800?Mandiri, Rp 16,5 Billions

4

PLTU 2 Jawa Barat (3x300 MW)

Pelabuhan Ratu, West Java

1. PT. Titan Mining energy

274.999NISP, Rp 18 Billions

2.PT. Baramutiara Prima.?

285.200BCA, Rp 18 Billions

3. PT. Arutmin Indonesia

285.881Danamon, Rp 18 Billions.

5

PLTU 2 Banten (2x300 MW)

Labuhan, Banten

1. PT. Arutmin Indonesia

269.703Danamon, Rp 11.5 Billions

2. PT. Padang Bara Sukses

325.000No Guarantee

3. PT. Titan Mining energy

259.999?DKI, Rp 11,5 Billions

4. PT. Kasih Industri

255.000?Mandiri, Rp 11.5 Billions

5. PT. Baramutiara Prima.?

259.550?BCA, Rp 11.5 Billions

6

PLTU 3 Banten (3x300 MW)

Tangerang, Banten

1. PT. Arutmin Indonesia

264.284Danamon, Rp 17 Billions

2. PT. Kasih Industri

252.000Mandiri, Rp 17 Billions

7

PLTU 1 Jawa Tengah (2x300 MW)

Rembang, Central Java

1. PT. Titan Mining energy

243.999?DKI, Rp 10,5 Billions

2. PT. Arutmin Indonesia

244.206?Danamon, Rp 10.5 Billions

Others

1

PLTU Parit Baru (2x55 MW)

West Kalimantan

1. PT. Titan Mining energy

259.999DKI, Rp 3 Billions

2. PT. Arutmin Indonesia

263.694Danamon, Rp 3 Billions

2

PLTU Suralaya 1,2,3,4 (existing)

Suralaya, Banten

1. PT. Surya Sakti Darma Kencana,??

263.850?Mandiri, Rp 7.5 Billions

2. PT. Arutmin Indonesia

248.171?Danamon, Rp 7.5 Billions

3. PT. Kasih Industri

252.000Mandiri, Rp7.5 Billions

3

PLTU Suralaya 5,6,7 (existing)

Suralaya, Banten

1. PT. Surya Sakti Darma Kencana,?

263.850?Mandiri, Rp 8 Billions

2. PT. Arutmin Indonesia

248.171?Danamon, Rp 8 Billions

3. PT. Kasih Industri

252.000Mandiri, Rp 8 Billions

4

PLTU Asam-Asam (2x65 MW)

South Kalimantan

1. PT. Titan Mining energy

149.999DKI, Rp 1.5 Billions

2. PT. Arutmin Indonesia

144.221Danamon, Rp 1.5 Billions