PT Paiton Energy: Prequalification (PQ) announcement for coal procurement for Paiton coal fired power plant unit 7&8 (2x615 MW)
Monday, May 25 2026 - 05:18 AM WIB
PT PAITON ENERGY
PREQUALIFICATION (PQ) ANNOUNCEMENT FOR
COAL PROCUREMENT FOR PAITON COAL FIRED POWER PLANT UNIT 7&8 (2x615 MW)
PT Paiton Energy (“PE”) hereby invites eligible companies to participate in the prequalification for coal procurement for Paiton Coal Fired Power Plant unit 7&8 (2x615 MW) (“Plants”) located at Paiton Power Complex, Probolinggo.
Interested parties must hold valid licenses and have sufficient coal reserves to support the operations of PE’s Plants commencing in year 2026 onwards.
General Requirements:
• Annual coal requirement: estimated at 2.5 million metric tonnes
• Term of contract: minimum 1 (one) year or up to 5 (five) years
• Coal Supply Agreement: to be entered and signed in 2026
• Coal delivery commencements: 3 (months) after decision
1. Coal Specification Requirements:
|
Description |
Units |
Min |
Max |
|
Gross Calorific Value (ar) |
kcal/kg |
4,900 |
5,400 |
|
Total Moisture (ar) |
% |
16 |
32 |
|
Sizing |
mm |
0 |
75 |
|
Fines |
% < 6 mm |
0 |
45% |
|
Grindability |
HGI |
39 |
55 |
|
Ash (ar) |
mg/kcal |
1.1 |
8.0 |
|
Sulphur (ar) |
mg/kcal |
0 |
0.75 |
|
AFT Initial (Reduction) |
0C |
1070 |
- |
|
Volatile Matter (ar) |
% by wt |
35 |
40 |
|
Sodium (adb) |
% in ash |
0 |
1 |
2. Registration & PQ Document Distribution
Date/Time: 25 May 2026 until 5 June 2026
Place: PT Paiton Energy
Sentral Senayan II, 5th floor, Jl. Asia Afrika no. 8, Jakarta 10270 Indonesia
E-mail address: coalprocurement@paitonenergy.com
3. Aanwijzing: 11 June 2026
4. PQ Submission Deadline: 26 June 2026 at 16:00 WIB
Complete requirements for Prequalification will be provided in the Prequalification Document.
Jakarta, 25 May 2026
PT Paiton Energy