PT PLN (Persero): Pre-qualification for seven locations of 300-400 MW coal fired steam power plants
Monday, July 10 2006 - 02:36 AM WIB
PRE-QUALIFICATION FOR SEVEN LOCATIONS OF 300-400 MW COAL FIRED STEAM
POWER PLANTS
1. PT PLN (Persero) called ?PLN? hereby invites for Pre-qualification for the Design, Engineering, Procurement and Construction, including commissioning of PLN Projects for seven, (7) separate Gross Turbine Generator Output 300-400 MW class Coal Fired Steam Power Plants (CFSPP) In Java. The Projects will be divided into seven (7) separate Projects or Lots:
No. |
Project Title |
No. of Unit |
Turbine Generator output (MW) |
Location |
Power grid (kV) |
1 |
PLTU 2 Banten |
2 |
300-400 MW |
Labuan, Banten |
150 |
2 |
PLTU 3 Banten |
3 |
300-400 MW |
Tangerang, Banten |
150 |
3 |
PLTU 1 Jawa Barat |
3 |
300-400 MW |
Indramayu, West Java |
150 |
4 |
PLTU 2 Jawa Barat |
3 |
300-400 MW |
Pelabuban Ratu, West Java |
150 |
5 |
PLTU 1 Jawa Tengah |
2 |
300?400 MW |
Rembang, Central Java |
150 |
6 |
PLTU 3 Jawa Timur |
2 |
300?400 MW |
Pacitan, East Java |
150 |
7 |
PLTU 3 Jawa Timur |
2 |
300?400 MW |
Tuban, East Java |
150 |
2. PLN intend to Pre-qualify parties as Contractors in the form of single company, JV or Consortium to undertake the design, engineering, procurement, construction, commissioning and project financing support. The qualified Applicants will be invited for the International Competitive Bidding process (ICR) of the above seven (7) separate Projects. The Pre-qualified Applicants shall bring its own financing support in the scheme of Export Credit as Supplier Credit to finance a minimum of 85 percent of total project cost. The remaining financing requirements will be supplied by PLN.
3. The Commercial Operation Date (COD) and handover for thee first Unit of each Project shall be 30 months from the signing date of the Contract, the next Unit shall be completed within 3 month following the first Unit.
4. The scope of Works shall be on a Turnkey basis, Include but not limited to Site investigation and Site development, Engineering, Procurement of goods, construction, testing & commissioning and the 150 kV Substation, related civil works and marine works, including the warranty.
5. Prequalification criteria will be based on the Applicant?s satisfactory demonstration of
a) Successful design, engineering, procurement, construction and commissioning of Coal Fired steam power Plants with project size of 200 MW or larger.
b) Financial capability as evidenced by audited balance sheet and Profit/Loss statement for the last two (2) years. The Applicant?s financial capability should be sound and satisfactory and shall be evaluated in term of Net Asset and Net Income.
6. Bid Document will be issued only to qualified Applicants.
7. Prequalification document will he available and can be collected during July 10th 14th, 2006 after payment of a non refundable fee in the amount of Rp. 10,000,000,- at the following address:
PT PLN (Persero)
c/a Chief of Procurement committee for (300-400 MW CFSPP Project Title) Project
Jalan Trunojoyo Blok M 1/135
Main Building 10 floor
Phone +6221-7227049 - Fax +6221-7251511
Kebayoran Baru Jakarta 12160
Indonesia.
Jakarta July 10, 2006
Procurement Committee for 300-400 MW CFSPP Project