Release: Antam monthly exploration report for September 2013
Monday, October 14 2013 - 01:02 AM WIB
ANTAM?s exploration activities were focused on nickel, gold, bauxite, and coal in September 2013, with total preliminary cost of Rp16 billion.
GOLD
ANTAM conducted gold exploration activities at Pongkor and Papandayan, West Java ; Cibaliung, Banten; and Batulicin, Jambi in September 2013. During the period, ANTAM spent Rp10.2 billion for gold exploration activities.
Exploration activities at Pongkor, West Java were consisted of geological mapping, core logging, core sampling, drilling, gravity and core analysis, as well as geological evaluation and modeling.
At Papandayan, West Java, ANTAM performed geological mapping, core logging, hand-auger/soil sampling, core and rock sampling, drilling, magnetic geophysical measurement, drill track measurement, GF track measurement, geochemical track measurement, sampling and point-load testing, core/rock/soil analysis, as well as geological evaluation and modeling.
At Cibaliung, Banten, ANTAM conducted geological mapping, core logging, soil sampling, core and rock sampling, drilling and geological modeling and evaluation.
Meanwhile, at Batulicin, Jambi, ANTAM performed geological mapping, core logging, rock and TSG samplings as well as geological evaluation and modeling.
NICKEL
Nickel exploration activities were conducted in Buli, North Maluku and Pomalaa, Southeast Sulawesi in September 2013.
At Buli, North Maluku , ANTAM conducted semi-detailed geological mapping, topographical measurements, drilling-grid and geophysical measurements, drilling, core logging, core, pet/mm, and XRD samplings; as well as SG and MC measurements.
The exploration activities at Pomalaa, Sulawesi Tenggara were consisted of semi-detailed geological mapping, drilling, core logging, core sampling, density and MC measurements, grid measurement, and polygonal measurement.
ANTAM spent Rp5 billion on nickel exploration activities in September 2013.
BAUXITE
ANTAM conducted bauxite exploration activities at Tayan and Munggu Pasir, West Kalimantan with total exploration cost of Rp845.9 million in September 2013. The exploration activities were comprised of detailed geological mapping, test pitting, test-pit logging and sampling. (end of release)
