Release: Cue Energy: Indonesian Drilling Update
Monday, June 19 2006 - 08:38 AM WIB
June 19, 2006 ? At 5 am on the 17 June 2006, Jeruk -3 St 1 was at a depth of 5086m measured depth (4811m vertical depth) and was running intermediate wireline logs.
Following completion of DST 1A, core 2 was cut over the interval 4978.5 to 5005.5m MD, with 5.5 metre of core recovered from 27 meters cut. Oil shows were present over the recovered portions of core.
The well was then drilled ahead to the current depth with no returns to the surface.
The forward plan is to complete logging and drill ahead to locate the oil water contact and to continue the evaluation of the reservoir interval.
Herbras -1
At 6 am on 17 June 2006, Herbras -1 was at a depth of 2428 meters and running into the hole after intermediate wireline logging operations.
The forward plan was to drill ahead.
Participants in the Sampang PSC are:
Santos (Sampang) Pty Ltd 40.5% (Operator)
Singapore Petroleum Sampang Ltd 36%
Cue Sampang Pty Ltd 13.5%
PT Petrogas Oyong Jatim* 10%
*Subject to finalization.
