Release: Cue Energy: Oyong production barge sails to field
Tuesday, August 21 2007 - 01:31 AM WIB
(21 August, 2007)--Cue is pleased to announce that the Seagood 101 production barge has sailed en route to the Oyong field.
The barge is expected to be on location around the 26-28th August 2007.
Anchors have already been placed, and once on location, commissioning will start ahead of first oil production in September 2007.
Participants in the Sampang PSC are: Santos (Sampang) Pty Ltd 45% (Operator), Singapore Petroleum Sampang Ltd 40% and Cue Sampang Pty Ltd 15%. (end of release)
