Release: PT Inco monthly exploration report for July 2008

Thursday, August 14 2008 - 06:26 AM WIB

Jakarta, August 12, 2008 ? PT International Nickel Indonesia Tbk (?PT Inco?) is reporting that the exploration activities for the month of July 2008 is continue to focus on the area within the Contract of Work.

Exploration Area :
? Bahodopi in Morowali Regency, Central Sulawesi
? Pomalaa in Kolaka Regency, South East Sulawesi
? Matarape in North Konawe Regency, South East Sulawesi
? Latao in North Kolaka Regency, South East Sulawesi
? Sorowako and North Lasobonti in East Luwu Regency, South Sulawesi

Total Cost: Approximately US$796,000

Exploration Method :
? The Bahodopi Project uses the core drilling method HQ-3 method with 50 meter and 200 meter grid pattern
? The Pomalaa Project uses the core drilling method HQ-3 method with 100 meter and 50 meter grid pattern
? The Matarape Project uses core drilling method HQ-3 with 400 meter grid pattern
? The North Lasobonti project uses cored drilling method HQ-3 with 400 meter grid pattern
? The Petea Project Sorowako uses core drilling method HQ-3 with 50 meter spacing
? The Latao Project is detailed mapping, hand auger and core drilling

Exploration Contractor :
? Bahodopi, Matarape, North Lasobonti, Petea, Pomalaa and Latao Projects are carried out by PT Inco and third parties

Testing results:
? Testing results is in the process of reserves estimation calculation by block modeling method
? Bahodopi project continue the drilling with 50 meter spacing in block 1A, uses 5 rigs and block 1G with 5 rigs
? Pomalaa project continue the drilling with 100 meter spacing in block 4, and 50 meter spacing in block 1 uses 13 rigs

Action Plan:
? Petea project continue its drilling of 50 meter spacing in Sorowako area with 4 rig, Lasobonti North project continue its drilling in North Lasobonti with 400 meter spacing stagger with 5 rig, matarape project continue its drilling in Kolonodale with 400 meter spacing stagger with 4 rigs
? All drillings are planned to obtain complete laterite profile
? Latao Project will be doing its directional drilling, uses 1 rig. (end of release)