Release: PT Inco: Monthly exploration report ? Jan 2006
Monday, February 13 2006 - 12:04 PM WIB
Exploration Area:
o Bahodopi in Central Sulawesi
o Larona area in South Sulawesi
Total Cost:
Estimated at US$189,332
Exploration Method:
o Core drilling HQ-3 size + 8" Large diameter drilling (for Bahodopi only)
Exploration Contractor:
The exploration is conducted by third party and supervised by Exploration Department of PT Inco
Testing Results:
o Drilling continued at block-4A and block-4C areas of the Bahodopi Project. The second stage of drilling program at the Block-4B area continued at grid spacing of 100 meter after the first stage of 200 meter grid spacing. The first stage of drilling at the block-4C area started at grid spacing of 200 meter. Samples were shipped to a laboratory in Jakarta.
o Drilling continued at Soroako Outer Area (SOA) project of Larona block. We are starting to ship the samples to a laboratory in Australia.
Action Plan:
The activity is still ongoing. (end of release)