Santos Indonesian drilling update
Thursday, July 21 2005 - 07:59 AM WIB
The following is excerpt from Santos Limited?s Weekly Drilling Report for week ending July 21, 2005:
| Delineation Well(Near Field Exploration/ Appraisal Well) | Jeruk 2 ST4 |
| Type | Oil Appraisal |
| Location | Offshore Indonesia |
| Sampang PSC, East Java Basin. 1.6km E of Jeruk 1, 35.0km SW of the Oyong Field, and some 40km SE of Surabaya. Jeruk 2 ST4 is an appraisal sidetrack drilled out of the existing Jeruk 2 wellbore. | |
| Status at 0600hrs -- 21/07/05 | Working stuck pipe. The current depth is 5213m with 113m progress for the week.During the past week two cores have been cut from 5105m to 5134m. |
| Planned Total Depth (Rev.) | 5570m |
| Interest | Santos Group 45.0% |
| Singapore Petroleum Sampang Ltd 40.0% | |
| Cue Sampang Pty Ltd 15.0% | |
| Operator | Santos |
-------------------------------------------
| Development Well | Wunut 15 |
| Type | Oil Development |
| Location | Onshore Indonesia |
| Brantas PSC, East Java Basin. 0.5km N of Wunut 1, and some 30km S of Surabaya. | |
| Status at 0600hrs -- 20/07/05 | Running Wireline logs. The current depth is 605m with 450m progress for the week. |
| Planned Total Depth | 945m |
| Interest | Lapindo Brantas 50% |
| Novus Indonesia Brantas Company 32% | |
| Santos Group 18% | |
| Operator | Lapindo Brantas |
-------------------------------------------
| Development Well | Oyong Development |
| Type | Oil Development: |
| Location | Offshore Indonesia, East Java Basin |
| Sampang PSC, 40km E of Jeruk 1 and some 80km E of Surabaya. 7 Deviated Well Batch Drilling Program (Oyong 4 DW1 ? Oyong 10 DW1) | |
| Status at 1500hrs -- 21/07/05 | Drilling ahead in Oyong 5DW1 at 1153m. Oyong 4 DW1: 244mm casing set at 1019m. Current depth 1023m. Oyong 5 DW1: 244mm casing set at 965m. Current depth 970m. Oyong 6 DW1: 244mm casing set at 1022m. Hole abandoned at 1200m. Oyong 7 DW1: 244mm casing set at 835m. Current depth 861m. Oyong 8 DW1: 244mm casing set at 1351m. Current depth 1354m. Oyong 9 DW1/ST1: 178mm casing set at 1339m. Current depth 1340m. Oyong 10 DW1: 244mm casing set at 835m. Current depth 838m. |
| Planned Total Depth | 920m SS |
| Interest | Santos Group 45.0% |
| Singapore Petroleum Sampang Ltd 40.0% | |
| Cue Sampang Pty Ltd 15.0% | |
| Operator | Santos Group |
