Santos reports Indonesian Q2 production

Friday, July 19 2013 - 01:25 AM WIB

Australia-based oil and gas firm Santos Limited has released its 2013 second quarter report. The following is an edited excerpt of the report on the company?s oil and gas production in Indonesia.

Production
Santos? net entitlement to gas production of 6.8 PJ was 13% lower than the corresponding period, with Wortel and Maleo production lower due to lower customer nominations. Combined Wortel and Oyong gross production for the quarter was 83 mmscf/day. Oyong net oil production of 24,700 barrels was lower than the previous quarter due to a lower net entitlement.

Development projects
Peluang (Santos 67.5%, operator)

Sanctioned in February 2013, the Peluang gas project is located in the Maleo gas field, offshore East Java in Indonesia. It will be developed as a tie-back to the existing facilities at Maleo, and will include one horizontal gas well, a minimum facility stand-alone wellhead platform and a pipeline to the Maleo platform. (end of edited excerpt)

Share this story

Tags:

Related News & Products