Statistic of the Java Bali Electricity System

Monday, June 9 2003 - 03:21 AM WIB

Statistic of the Java Bali Electricity System

Date: Monday, June 9, 2003
Initial Capacity: 18,612 MW
Net Capacity: 14,047 MW
Peak Level: 13,250 MW (estimated)
Reserve: 797 MW
Reserve Status: NORMAL

Status: RESERVE SHUTDOWN

No

Power Unit

MWStatusStartFinishDescription
Total = 0 Unit

?

?

?

?

?

?

Status: DERATING

No

Power Unit

MWStatusStartFinishDescription
1PLTGU Muaratawar3DERATING2/5/200330/6/2003-
2PLTGU Tambaklorok32DERATING26/4/200330/6/2003-
3PLTG Gilimanuk23DERATING10/7/200230/6/2003-
4PLTU Tambaklorok #1234DERATING12/3/200330/6/2003-
5PLTGU Muarakarang blok 156DERATING20/5/200330/6/2003-
6PLTGU Priok35DERATING4/6/20031/7/2003-
7PLTD Pesanggaran23DERATING4/6/200330/6/2003-
8PLTG Pesanggaran3DERATING4/6/200330/6/2003-
9PLTGU Gresik26DERATING4/6/200330/6/2003-
10Cikarang60DERATING21/5/200330/6/2003-
11PLTU Suralaya8DERATING7/6/200330/6/2003-
12PLTU Gresik# 1, 2, 313DERATING5/5/200330/6/2003-

?

Total = 12 Unit

266???

?

Status: MAINTENANCE

No

Power Unit

MWStatusStartFinish

Description

1PLTU Priok #345PO4/3/200330/6/2003Disruption at boiler pipe
2PLTGU Tambaklorok #1.3104PO26/4/200330/6/2003Inspection
3PLTA Saguling #1175PO26/6/200330/6/2003Disruption at MTR1
4PLTA Cirata #3125PO26/6/200230/6/2003Disruption at generator
5PLTGU Muaratawar #1.3138PO10/3/200330/6/2003Stator assembling
6PLTU Paiton #6610PO15/5/200330/6/2003Maintenance
7PLTGU Muaratawar #2.1138PO31/12/200330/6/2003Coating & blades reparation
8PLTG Priok #118PO3/12/200230/6/2003Disruption (24-06-2002)
9PLTA Jatiluhur70PO12/3/200330/6/2003-
10PLTGU Gresik #2.1102PO20/5/200330/6/2003-
11PLTGU Muaratawar #2.2138PO11/3/200330/6/2003Inspection Type C
12PLTGU Tambaklorok #1.1100PO21/3/200330/6/2003High Vibration
13PLTGU Muaratawar #1.2138PO12/3/200330/6/2003Inspection type C
14PLTG Sunyaragi #118PO22/2/200330/6/2003Gear accessories reparation
15PLTU Muarakarang 4165PO9/3/200330/6/2003Serious Inspection
16PLTU Priok #445PO14/3/200330/6/2003Disruption at first stage nozzle
17PLTG Priok #318PO31/3/200330/6/2003

-

18PLTG Priok #441PO31/3/200330/6/2003Disruption at first stage nozzle
19PLTG Priok #541PO31/3/200330/6/2003Disruption at first stage nozzle
20PLTP Dieng25PO31/5/200330/6/2003Disruption at hydraulic system
21PLTP G. Salak #1, 2, 3165PO30/4/200330/6/2003Disruption by the landslide
22PLTGU Gresik # 2.3102PO17/5/200330/6/2003

-

23PLTGU Priok #1.0179PO6/5/200330/6/2003Major Inspection
?

Total = 23 Unit

2700????

?

Status: RESERVE SHUTDOWN

No

Power Unit

MWStatusStartFinishDescription

?

Total = 0 Unit

?

?

?

?

?

?

Source: Perusahaan Listrik Negara (PLN)


Abbreviation

PLTA: Hydro power plant
PLTD: Diesel power plant
PLTG: Gas fired power plant
PLTP: Geothermal power plant
PLTU: Coal fired power plant
PLTGU: Combined fired power plant