Straits reports C. Kalimantan Q3 gold, silver output

Wednesday, October 22 2008 - 06:23 AM WIB

The following is an excerpt from Straits Asia Resources on Central Kalimantan gold project, taken from the quarterly report ended Sept 30, 2008 released on Wednesday.

Mt Muro, Central Kalimantan
Straits 100%

The Mt Muro operation exceeded forecasts and achieved record production for the quarter with 17,188 ounces of gold and 98,498 ounces of silver poured. Mining performed well for the quarter, notably exceeding targets for gold equivalent ounces mined. The re-commissioned SAG Mill was able to capitalise on the good mining result as well as processing the large inventory of scats built up over the recent months. The tonnes sent to leach were also a record for the quarter.

Commissioning of individual components of the Coal Fired Power Station (CFPS) commenced in September and it is expected that the CFPS will be online and generating cheaper power supply by early November.

Unit cash costs reduced due to the increase in throughput and production. The average unit cash cost for the quarter was US$736 per ounce down from US$975. Diesel remains a cost and logistics impost but this will reduce once the CFPS is online. (end of excerpt)

Unit Sept Qtr
2008
June Qtr
2008
Mar Qtr
2008
YTD
Ore Milled tonnes 172,062 104,906 108,378 385,346
Gold grade g/t Au 3.50 2.98 3.74 3.43
Silver grade g/t Ag 32 16 17 23
Gold recovery % Au 90.8% 92.7% 92.4% 91.8%
Silver recovery % Ag 58.8% 62.6% 58% 59.8%
Production gold* oz Au 17,188 10,003 11,725 38,916
Production Silver oz Ag 98,498 33,461 35,325 167,284
Gold Sold oz Ag 15,431 9,323 16,235 40,989
* Production reported is gold poured