Table: List of power plants with PPA already terminated

Thursday, January 26 2017 - 06:58 AM WIB

The following is the list of power plants with Power Purchase Agreement (PPA) already terminated, which was issued by PT PLN during a parliamentary hearing on Tuesday. (ed)

No Name of Power Plants Region Type Capacity (MW) Developer Next Progress
1. Bengkalis Sumatra Coal-fired power plant (PLTU) 2 x 10 Jo PT Modaco Energys, PT Waskita Karya,PT Kelsari, PT Angkasa Buana Cipta, Guandong Machinery Import & Eksport Replacement : developing gas-machine power plant (PLTMG) Bengkalis 20 MW. Planned commercial operation date (COD) 2018
2. Buntok Kalimantan PLTU 2 x 7 PT Truba jaya Engineering Replacement : developing sub-station (GI) Bunto 30 mega volt ampere (MVA) and already in operation
3. Kuala Pembuang Kalimantan PLTU 2 x 3 Consortium of PT Multi Structure ? Qingdao Jeineng PSE Co. Ltd Replacement : developing GI Kuala Pembuang. Planned operation in 2018
4. Tarakan Kalimantan PLTU 2 x 7 PT Adhi Karya Replacement: developing PLTU 2x 25 MW in other location
5. Sampit Kalimantan

 

PLTU

 

2 x 25 Consortium of PT Citicon Adhi Nugraha ? PT Waltes Energi Nusantara ? PT Waskita Karya Development continued with assignment to subsidiary
6. Kota baru Kalimantan

 

PLTU

 

2 x 7 PT Citicon Adhi Nugraha ? PT Waltes Energi Nusantara ? PT Waskita Karya Development continued with PLN?s self management, awaiting BKP?s audit
7. Bau bau Sulawesi & Nusa Tenggara PLTU 2 x 10 Consortium of PT Mega Eltra ? PT Sakti Mas Mulia ? Zibo Sangte Power Equipment Co.Ltd Replacement: to be developed PLTMG with capacity 30 MW. Under tender process.
8. Kalibumi Maluku & Papua PLTMH 2 x 1,3 PT Buminata Aji Perkas Under process of FS and retendering. Target of operation in 2019
9. Jayapura Maluku & Papua

 

PLTU 2 x 15 PT Tenaga Listrik Matao Replacement: developing PLTG/MG mobile power plant (MPP) Jayapura 50 MW (Planned operation in 2017) and Jayapura Peaker (Planned operation in 2018)
10. Nias Sumatra PLTU  3 x 7 PT Irsac power Replacement: developing mobile power plant (MPP) Nias 1x25 MW. Already in operation
11. Nabire ? Kalibobo Maluku & Papua PLTU 2 x 7 PT Nabire Sumber Energi Under process of financing, deadline March 2017
12. Klalin Maluku & Papua PLTU 2 x 15  PT Zug Power Satu Replacement : developing PLTMG Sorong 50 MW. Planned operation in 2018
13. Gorontalo Energi Sulawesi & Nusa Tenggara PLTU 2 x 7 PT Gorontalo Energi Replacement: developing PLTMG Gorontalo Peaker 100 MW. Already in operation
14. Kalselteng 1/Kalteng 1 Kalimantan PLTU 2 x 100 PT SKS Listrik Kalimantan Continued. Now under construction
15. Biak Maluku & Papua PLTU 2 x 7 PT Zug Power Satu Termination of replacement: developing PLTMG Biak 15 MW, target of operation 2018 and 2x10 MW with target of operation in 2017/2018
16. Andai Maluku & Papua PLTU  2 x 7 PT Harmoni Energi Indonesia Manokwari Termination of replacement: developing MPP Manokwari 20 MW. Now under tender process and target of operation in 2018 and PLTMG Manokwari 20 MW, target of operation in 2019
17. Tapak Tuan Sumatra PLTU 2 x 7 KSO PT. Zug Industry Indonesia - PT. Waskita Karya (Persero) Replacement: developing GI Tapak Tuan 30 MVA. Planned operation 2018
18. Tebo Sumatra PLTU 2 x 7 Consortium of PT. TAME ? SFECO Replacement: developing GI Tebo 60 MVA. Planned operation 2017
19. Selat Panjang Sumatra PLTU 2 x 7 PT. Bousted Maxitherm Industries Replacement: developing GI Selat Panjang 60 MVA. Planned operation 2019
20. Rengat Sumatra PLTU 2 x 5.5 PT. Eksploitasi Energi Indonesia Replacement: developing PLTG/MPP Tembilahan 30 MW. Planned operation 2018
21. Tangkuban Perahu 1 (FTP 2) Jawa Tengah PLTU 55 PT. Tangkuban Perahu Geothermal Power PLN is in process of getting Mine Working Area Permit (WKP) from government to allow development of PLTU Tangkuban Perahu.

Source: PT. PLN